Downloads
Bidder Variance Report
00019 00005a 00018 Bidder Variance.xls

Certified Bid Tabulation
00019 00005a 00018 Certified Bidtab.pdf

Addendum
ADDENDUM 1.pdf

Addendum
ADDENDUM 2.pdf

Supplemental Information
DPF-037-I(33) As-Built.pdf

Plans
NFHWY00019 Plans.pdf

Specifications
NFHWY00019 Specifications.pdf

Bid Forms EBSX File
NFHWY00019.001x.zip

Bid Forms EBSX File
NFHWY00019.002x.zip

Bid Forms EBSX File
NFHWY00019.zip

Notice to Bidders
NTB1.pdf

Supplemental Information
Parks Hwy Revised Final PS&E Designer's Notebook Spreadsheet Calculations_Design.xlsx

Supplemental Information
Revised Final PS&E_Designer's Notebook_Design.docx

Supplemental Information
Supplemental Info.zip

Proposal NFHWY00019

Resurface the Parks Highway between MP 356-362, including all ramps. Project work will include pavement preservation, bridge work, roadside hardware, drainage improvements, ADA improvements, and utilities. Install Automatic Vehicle Classifier (AVC). Work includes roadside hardware and utilities.Resurface Old Airport Road between the Mitchell Expressway off-ramp and the intersection with the Fred Meyer's driveway. Project work will include pavement preservation, roadside hardware, drainage improvements and intersection improvements.
Proposal information table
Date Generated:03/26/2019Sections: 1
Date Revised: 03/26/2019 Amendments: 2
Call Order: 1 Highway Number: 1758
Items: 64 Counties: Fairbanks North Star
Project ID: 0A45029 / 0002359 / 0106081

March 07, 2019 08:03 AM AKST

Project Name: Parks Highway MP 356-362 Resurfacing, Automated Vehicle Classifier Upgrades & Construction & Old Airport Road Resurfacing Plan Holders List

Federal # / IRIS Program #: 0A45029/NFHWY00019, 0106081/NFHWY00005a & 0002359/NFHWY00018

Region: Northern

Advertise Date: March 7, 2019

Description: The project consists of resurfacing the Parks Highway between MP 356-362, including all ramps. Project work will include pavement preservation, bridge work, roadside hardware, drainage improvements, ADA improvements, and utilities.

 

Installing Automatic Vehicle Classifier (AVC). Work includes roadside hardware and utilities.

 

Resurfacing Old Airport Road between the Mitchell Expressway off-ramp and the intersection with the Fred Meyer's driveway. Project work will include pavement preservation, roadside hardware, drainage improvements and intersection improvements.

 On the Job Trainees/Apprentices (item 645): 1,000 Hours

Engineer's Estimate Range: between $10,000,000 and $20,000,000



You must be logged in to view item data.