Proposal SFHWY00104 |
Date Generated: | 03/10/2020 | Sections: | 1 |
Date Revised: | 04/14/2020 | Amendments: | 6 |
Call Order: | 1 | Highway Number: | |
Items: | 58 | Counties: | Kodiak Island |
Project ID: | 0003218 |
May 27, 2020 03:46 PM AKDT
The Certified Bid Tabulation has been uploaded for this project.
April 14, 2020 01:08 PM AKDT
Notice To Bidders # 1 has been uploaded for this project.
April 14, 2020 09:25 AM AKDT
Addendum # 5 has been uploaded for this project.
April 13, 2020 11:03 AM AKDT
Addendum # 4 has been uploaded for this project.
April 07, 2020 12:41 PM AKDT
Addendum # 3 has been uploaded for this project.
March 27, 2020 10:50 AM AKDT
Addendum # 2 has been uploaded for this project.
March 25, 2020 01:53 PM AKDT
Addendum # 1 has been uploaded for this project.
March 11, 2020 10:32 AM AKDT
Additional supplemental information has been uploaded for this project.
March 10, 2020 08:02 AM AKDT
Project #: 0003218/SFHWY00104
Region: Southcoast
Advertise Date: 03/10/2020
Project Description: This project is a preventative maintenance project on the Kodiak Harbor Channel Bridge. The project would resurface the concrete deck with a polymer concrete overlay, field metalize all structural steel surfaces, replace bridge deck drain grates, repair concrete bridge barriers and steel connector plates, and replace utility hangers. The project would also reconstruct the asphalt concrete at both approaches, replace the concrete sidewalk, curb, and gutter at the north approach, replace an existing storm drain pipe and structure, and restore and embankment slope. The project is necessary to reduce maintenance costs and address deficiencies identified on the 2018 Bridge Inspection Report.
DBE: 0%
On the Job Training/Apprentices Item 645): 2 Trainees/ 1000 Hours
Engineers Estimate Range: $10,000,000 - $20,000,000