Downloads
Supplemental Information
56018_Calculation Binder.pdf

Supplemental Information
Chiniak Highway XC (05.24.17).pdf

Supplemental Information
Geotechnical Data.zip

Addendum
Z560180000- Addendum 1.pdf

Addendum
Z560180000- Addendum 2.pdf

Addendum
Z560180000- Addendum 3.pdf

Addendum
Z560180000- Addendum 4.pdf

Certified Bid Tabulation
Z560180000- Bid Tabulation.pdf

Bidder Variance Report
Z560180000- Bidder Variance.xls

Plans
Z560180000- KDK Chiniak Highway Erosion Response- Plans.pdf

Specifications
Z560180000- KDK Chiniak Highway Erosion Response- Specs.pdf

Bid Forms EBSX File
Z560180000.001.zip

Bid Forms EBSX File
Z560180000.002.zip

Bid Forms EBSX File
Z560180000.003.zip

Bid Forms EBSX File
Z560180000.004.zip

Bid Forms EBSX File
Z560180000.zip

Proposal Z560180000

Identify and implement solutions to problems related to erosion on the Chiniak Highway. This may include realignments of the Highway.
Proposal information table
Date Generated:10/09/2018Sections: 1
Date Revised: 10/09/2018 Amendments: 4
Call Order: 1 Highway Number:
Items: 71 Counties: Kodiak Island
Project ID: 0001523

October 09, 2018 01:47 PM AKDT

October 09, 2018 01:43 PM AKDT

Addendum #4 has been issued for this project.


October 05, 2018 02:30 PM AKDT

Addendum #3 has been issued for this project.


October 03, 2018 12:38 PM AKDT

Addendum #2 has been issued for this project.


September 27, 2018 02:14 PM AKDT

Addendum #1 has been issued for this project.


September 10, 2018 11:12 AM AKDT

Federal# / IRIS Program #: 0001523 / Z560180000

Region: Southcoast

Advertise Date:  09/10/2018

Description: This project will address erosion that is threatening the safety and stability of the Chiniak Highway at ten different sites between mileposts (MPs) 19 and 43. The two erosion issues endangering the integrity of the Chiniak Highway bridges and road embankment are: 1) erosion occurring along the coastal bluffs steepened beyond the angle of repose causing mass sliding and slumping adjacent to the highway, and 2) erosion occurring at bridge and culvert stream crossings from flood events. To address the issues this project will install abutment protection to bridges, new culverts, re-establish ditches, and realign the highway where necessary.

DBE: 0%

On the Job Training/Apprentices (Item 645): 1 Trainees/ 500 Hours

Engineers Estimate Range: $5,000,000 - $10,000,000


You must be logged in to view item data.