Downloads
Supplemental Information
58481_CROSS SECTIONS AND TUNNEL TIGHT ANALYSIS.pdf

Supplemental Information
58481_ESCP.pdf

Notice to Bidders
58481_NTB 02.pdf

Notice to Bidders
58481_NTB01.pdf

Notice to Bidders
58481_NTB03.pdf

Supplemental Information
58481_Panel Condition Assessment.pdf

Plans
58481_Plan.pdf

Supplemental Information
58481_Sheet DP03.pdf

Specifications
58481_Spec.pdf

Supplemental Information
58481_TCP.pdf

Addendum
Addendum 1 Z584810000.pdf

Addendum
Addendum 2 Z584810000.pdf

Bid Opening Results
Bid Tabulation Excel.xls

Bidder Variance Report
Bidder Variance.xls

Certified Bid Tabulation
CertifiedBidTab.pdf

Supplemental Information
Existing Surfaces.zip

Supplemental Information
Rock Stability Assessment.pdf

Supplemental Information
Shotcrete Areas.zip

Supplemental Information
x-base 151030 tunnel drainage.dwg

Bid Forms EBSX File
Z584810000.001xzip.zip

Bid Forms EBSX File
Z584810000.002xzip.zip

Bid Forms EBSX File
Z584810000zip.zip

Proposal Z584810000

This federally funded project will crown drainage collection to reduce water flowing into the subgrade, reduce panel settlement and retard the corrosion of invert panel rebar, rail and rail connections. Work also includes invert panel concrete surface sealing to mitigate rebar corrosion, infiltration drainage collection, traffic control electronic signage, application of fluid-applied membrane roofing on the roof of the Whittier portal, and stabilization of the tunnel walls and ceiling to mitigate rock fall hazard.
Proposal information table
Date Generated:08/20/2018Sections: 1
Date Revised: 08/20/2018 Amendments: 2
Call Order: 1 Highway Number:
Items: 41 Counties: Kenai Peninsula
Project ID: 0496014

You must be logged in to view item data.