New Try the new experience
The new Bid Express experience is available for this page. Learn more. Maybe later

The letting has ended.

Letting of January 28, 2022

Letting information table
Letting ID: 20220128
Cut-Off Time: 10:00:00 AM CDT
   

Proposal table
Proposal Call Order Project ID Items Amendments Counties
(35 Active Proposals)
20220128007 007 CRSAPC-STPPC-4120(251) 37 0 LEE
for constructing the Full Depth Reclamation, Resurfacing, and Traffic Stripe on CR-318 from the junction of CR-248 to the junction of CR-249 (Site 1) and on CR-249 from the junction of CR-379 to the junction of CR-318 (Site 2). Length 6.508 mi.
20220128014 014 IM-I065(512) 45 0 MOBILE
for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on I-65 from 0.560 mile north of the SR-158 Underpass to 0.410 mile north of the SR-13 (US-43) Interchange in Creola. Length 6.362 mi.
20220128016 016 IM-HSIP-IMGR-I459(318) 54 0 JEFFERSON
for constructing the Micro-Milling, Resurfacing, Guardrail Safety Improvements, and Traffic Stripe on I-459 from 0.250 mile south of the SR-38 (US-280) Overpass to 0.240 mile south of the Grants Mill Road Overpass in Irondale. Length 7.311 mi.
20220128020 020 NH-0002(594) 42 0 LIMESTONE
for constructing the Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-2 (US-72) from a point east of the Elk River Bridges (MP 59.960) to a point 0.020 mile east of the intersection of Shaw Road (MP 66.250) west of Athens. ...
20220128021 021 NH-0002(596) 41 0 MADISON
for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-2 (US-72) in Madison from the junction of County Line Road to the junction of Perimeter Parkway in Huntsville. Length 6.699 mi.
20220128022 022 NH-0002(598) 41 0 LAUDERDALE
for constructing the Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-2 (US-72) from a point 0.080 mile east of the junction of Bank Street (MP 56.074) in Rogersville to a point east of the Elk River Bridges (MP 59.960). Le...
20220128023 023 NH-0003(645) 31 0 LIMESTONE
for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-3 (US-31) from 0.110 mile north of the junction of Thomas L. Hammons Road to 0.130 mile south of the intersection of SR-304. Length 4.851 mi.
20220128024 024 NH-0008(603) 45 0 DALLAS
for constructing the Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-8 (US-80) from a point 0.400 mile west of the Cahaba River Bridges (MP 73.765) to the junction of SR-14 in Selma. Length 7.490 mi.
20220128025 025 NH-0009(582) 39 0 MONTGOMERY
for constructing the Planing, Resurfacing, and Traffic Stripe on SR-9 (US-331) from the end of the 2-lane section (MP 83.582) to a point near the junction of Old Hayneville Road (MP 88.260) northwest of Ramer. Length 4.678 mi.
20220128026 026 NH-0010(553) 60 0 PIKE
for constructing the Planing, Resurfacing, and Traffic Stripe on SR-10 (US-231) from the junction of Diamond Drive in Troy to Veterans Boulevard in Brundidge. Length 6.522 mi.
20220128027 027 NH-0013(619) 58 0 MARENGO MOBILE
for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-13 (US-43) from the intersection of Oakley Avenue in Linden to the junction of 12 Link Road (Site 1) and the Planing, Resurfacing, and Traffic Stripe on SR-13 (US-43) from the j...
20220128028 028 NH-0013(624) 44 0 FRANKLIN
for constructing the Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-13 from 0.080 mile north of the intersection of Underwood Road in Russellville to the Colbert County Line. Length 4.519 mi.
20220128029 029 NH-0038(550) 41 0 LEE
for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-38 (US-280) from the Chambers County Line to the junction of SR-147 in Auburn. Length 6.412 mi.
20220128030 030 NH-0042(540) 54 0 BALDWIN
for constructing the Planing, Resurfacing, and Traffic Stipe on SR-42 (US-98) from a point west of the Elberta City Limits to a point on the Perdido Bay Bridge (MP 80.688). Length 11.687 mi.
20220128031 031 NH-0042(541) 47 0 MOBILE
for constructing the Planing, Resurfacing, and Traffic Stripe on SR-42 (US-98) from the junction of Snow Road to the junction of Magnolia Grove Parkway southwest of Semmes. Length 5.473mi.
20220128034 034 NH-FMGR-0001(622) 42 1 CALHOUN
for constructing the Planing, Resurfacing, Bridge Guardrail Retrofit, and Traffic Stripe on SR-1 (US-431) from 0.280 mile south of the junction of SR-204 to the Etowah County Line. Length 4.073 mi.
20220128036 036 NH-HSIP-FMGR-0006(584) 42 0 CHILTON
for constructing the Micro-Surfacing, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-6 (US-82) from the Bibb County Line to the Autauga County Line to include the Maplesville Rest Area. Length 16.785 mi.
20220128039 039 RP-NH-0003(640) 33 0 LIMESTONE
for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-3 (US-31) from 0.130 mile north of the intersection of SR-304 to 0.090 mile north of SR-2 (US-72) in Athens. Length 3.721 mi.
20220128040 040 RP-NH-0017(582) 56 0 MOBILE
for constructing the Planing, Resurfacing, and Traffic Stripe on SR-17 (US-45) from the junction of Springhill Avenue to the I-65 Interchange in Prichard. Length 4.003 mi.
20220128042 042 RP-STPAA-0069(569) 35 0 WALKER
for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-69 from the junction of SR-118 to the junction of SR-5 in Jasper. Length 1.338 mi.
20220128045 045 STPAA-0003(641) 29 0 CHILTON
for constructing the Planing, Resurfacing, and Traffic Stripe on SR-3 (US-31) from the junction of Ben Wells Road to the junction of Newport Avenue in Clanton. Length 2.334 mi.
20220128046 046 STPAA-0010(554) 52 0 CHOCTAW MARENGO
for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-10 from the junction of Ida Avenue in Butler to 0.290 mile west of the intersection of SR-69 southeast of Tompkinsville. Length 12.177 mi.
20220128047 047 STPAA-0017(588) 50 0 CHOCTAW
for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-17 from a point north of Little Mill Creek to 0.400 mile north of the junction of Cypress Lane northeast of Toxey. Length 7.464 mi.
20220128048 048 STPAA-0021(574) 47 0 MONROE
for constructing the Planing, Resurfacing, and Traffic Stripe on SR-21 from the Escambia County Line to the junction of Presley Road south of Frisco City. Length 12.661 mi.
20220128049 049 STPAA-0134(511) 50 2 DALE
for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-134 from the junction of SR-85 to the junction of SR-123. Length 6.828 mi.
20220128050 050 STPAA-0183(505) 28 0 PERRY TUSCALOOSA
for constructing the Resurfacing (Micro-Surfacing Seal Coat and Scrub Seal) and Traffic Stripe on SR-183 from MP 34.774 at the north end of the Caffe Creek Bridge to the Chilton County Line (Site 1) and the Micro-Milling, Resurfacing (Micro-Surfacing ...
20220128051 051 STPAA-0185(501) 104 0 BUTLER
for constructing the Roadway Improvements and Roadway Widening (Grading, Drainage, Pavement, Traffic Signals, and Traffic Stripe) on SR-185 from the junction of SR-245 to 0.200 mile north of the junction of CR-73 (Cahaba Road) in Greenville. Length 0....
20220128055 055 STPAA-HSIP-0014(553) 30 0 HALE
for constructing the Safety Widening, Leveling, Resurfacing, and Traffic Stripe on SR-14 from 0.500 mile east of the junction of CR-38 to 0.780 mile west of the junction of CR-21 northwest of Greensboro. Length 8.592 mi.
20220128056 056 STPAA-HSIP-0050(508) 43 0 TALLAPOOSA
for constructing the Safety Widening, Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-50 from the Elmore County Line to the intersection of SR-49. Length 7.957 mi.
20220128057 057 STPAA-HSIP-0059(518) 48 0 BALDWIN
for constructing the Planing, Resurfacing, Steel Blockout Replacement, and Traffic Stripe on SR-59 from the junction of McMillan Road to the intersection of CR-80 northeast of Stockton. Length 12.450 mi.
20220128058 058 STPAA-HSIP-0125(505) 61 0 COFFEE
for constructing the Safety Widening, Micro-Milling, Resurfacing, and Traffic Stripe on SR-125 from the junction of SR-12 (US-84) in Elba to the intersection of SR-167. Length 12.419 mi.
20220128059 059 STPAA-HSIP-0165(505) 52 0 RUSSELL
for constructing the Safety Widening, Micro-Milling, Resurfacing, and Traffic Stripe on SR-165 from 0.360 mile south of the junction of New Hope Church Road to 0.100 mile south of the junction of Nuckols Road. Length 12.163 mi.
20220128060 060 STPAA-HSIP-0181(509) 39 0 BALDWIN
for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-181 from the junction of Quail Creek Drive in Fairhope to the junction of Mosley Drive. Length 1.690 mi.
20220128069 069 STPOA-0821(250) 21 0 CALHOUN
for constructing the Resurfacing and Traffic Stripe on Roy Webb Road from the junction of SR-21 to the junction of Foster West Road. Length 4.099 mi.
20220128078 078 ST-037-999-025 22 0 JEFFERSON
for constructing the Resurfacing and Traffic Stripe on various routes at various locations within Fountain Heights in Birmingham as indicated in the plans. Length 4.924 mi.

Error

Bid Express: New Roads

Bid Express: New Roads is a series of updates aimed at creating a more personalized experience that better caters to individual needs, jobs, and responsibilities.

Over the coming months, we'll be rolling out redesigned experiences to you across the entire service. Learn more.

Don't worry, if you don't love it, you can switch back to classic Bid Express for a limited time while you get used to the new look.

No thanks