20220429001
|
001 |
CMAQ-7282(600) |
66 |
0 |
JEFFERSON |
for constructing the Safety Improvements (Curb and Gutter
Installation, Drainage Improvements, and Sidewalk
Installation) on CR-1142 (Chapel Road) from the
intersection of Park Avenue to the junction of Stone Brook
Parkway in Hoover. Length 1.150 mi. |
20220429004
|
004 |
HSIP-0008(584) |
110 |
0 |
SUMTER |
for constructing the Intersection Improvements (Grading,
Drainage, and Pavement) on SR-8 (US-80) at the junction of
SR-28 and the junction of CR-25 southeast of Livingston.
Length 0.445 mi. |
20220429005
|
005 |
HSIP-0171(516) |
75 |
0 |
TUSCALOOSA |
for constructing the Roadway Improvements (Turn Lane
Addition, Grading, Drainage, Pavement, Micro-Milling,
Resurfacing, and Traffic Stripe) on SR-171 at Prewitt Loop
Road northwest of Northport. Length 0.315 mi. |
20220429008
|
008 |
IM-I022(309) |
68 |
0 |
MARION |
for constructing the Planing, Resurfacing, Guardrail
Installation, and Traffic Stripe on I-22 from a point west
of the Reese Road Overpass (MP 6.000) to the Exit 16
Interchange (MP 16.950) in Hamilton. Length 10.950 mi. |
20220429009
|
009 |
IM-I065(520) |
33 |
0 |
BUTLER |
for constructing the Widening, Micro-Milling, Resurfacing,
and Traffic Stripe on I-65 from 0.870 mile north of the
junction of Pettibone Road to the junction of CR-41
northeast of Greenville. Length 7.259 mi. |
20220429010 |
010 |
IM-I065(523) |
This proposal has been withdrawn |
|
|
|
WITHDRAWN FROM THE LETTING
|
20220429016
|
016 |
NH-HSIP-0013(622) |
63 |
0 |
WINSTON |
for constructing the Micro-Milling, Resurfacing (Scrub
Seal), and Traffic Stripe on SR-13 from the junction of
SR-129 to the Marion County Line (Site 1) and the Safety
Widening, Micro-Milling, Resurfacing (Scrub Seal),
Guardrail Installation, and Traf... |
20220429019
|
019 |
RP-IM-I059(424) |
34 |
0 |
TUSCALOOSA |
for constructing the Resurfacing (Scrub Seal), Guardrail
Installation, and Traffic Stripe on the I-59 Service Roads
(Mercedes Drive, Southbound Service Road, and Daimler Benz
Boulevard) at the Exit 89 Interchange in Vance. Length
2.024 mi. |
20220429021
|
021 |
RP-STPAA-HSIP-0017(587) |
44 |
0 |
LAMAR |
for constructing the Safety Widening, Micro-Milling,
Resurfacing (Scrub Seal), and Traffic Stripe on SR-17 from
0.340 mile east of the junction of Payne Chapel Road to a
point south of the Luxapalila Valley Railroad (MP 229.156)
in Millport. Length 2.... |
20220429023
|
023 |
STPAA-0091(507) |
30 |
0 |
CULLMAN |
for constructing the Resurfacing (Triple Layer Bituminous
Treatment), Guardrail Installation, and Traffic Stripe on
SR-91 from the junction of SR-69 to Sullivan Creek (MP
9.180) in Arkadelphia. Length 9.179 mi. |
20220429025
|
025 |
STPAA-0207(502) |
26 |
0 |
LAUDERDALE |
for constructing the Micro-Milling, Resurfacing, and
Traffic Stripe on SR-207 from the intersection of SR-2
(US-72) in Rogersville to a point 0.160 mile north of the
junction of CR-55. Length 1.604 mi. |
20220429026
|
026 |
STPAA-0257(501) |
48 |
0 |
WALKER |
for constructing the Widening, Micro-Milling, Resurfacing
(Scrub Seal), and Traffic Stripe on SR-257 from the
junction of SR-195 to the junction of CR-43 northeast of
Jasper. Length 6.739 mi. |
20220429027
|
027 |
STPAA-0283(501) |
25 |
0 |
CHEROKEE |
for constructing the Resurfacing (Scrub Seal) and Traffic
Stripe on SR-283 from the junction of SR-9 to the junction
of CR-148 in Centre. Length 2.045 mi. |
20220429030
|
030 |
STPAA-HSIP-0004(549) |
65 |
0 |
JEFFERSON |
for constructing the Safety Widening, Micro-Milling,
Resurfacing, and Traffic Stripe on SR-4 (US-78) from a
point west of the Little Cahaba River Bridge (MP 114.668)
to the St. Clair County Line (Site 1) and on SR-25 from the
Shelby County Line to the... |
20220429031
|
031 |
STPAA-HSIP-0086(502) |
57 |
0 |
PICKENS |
for constructing the Safety Widening, Planing, Resurfacing
(Scrub Seal), Curb Ramp Installation, Guardrail
Installation, and Traffic Stripe on SR-86 from the junction
of Ladow Center Circle to the roundabout (MP 14.075) in
Carrollton. Length 4.785 mi. |
20220429033
|
033 |
STPAA-I065(519) |
51 |
0 |
CHILTON |
for constructing the Installation of an Intelligent
Traffic Systems (ITS) and Network Infrastructure to Support
Advanced Corridor Management on I-65 from MP 198.004 to MP
219.591. Length 21.585 mi. |
20220429036
|
036 |
STPBH-3716(250) |
140 |
1 |
JEFFERSON |
for constructing the Roadway Improvements (Grading,
Drainage, Pavement, Sidewalk Installations, and Bridge
Culvert) on Polly Reed Road from the junction of SR-75 to
the junction of Reed Road Northeast in Centerpoint. Length
0.685 mi. |
20220429040
|
040 |
STPSU-3520(251) |
11 |
0 |
HOUSTON |
for constructing the Resurfacing and Traffic Stripe on
Ashford Road from the junction of Enon Road to the junction
of Ben Ivey Road northeast of Avon (Site 1); on Roney Road
from the junction of SR-1 (US-431) to the junction of
Walden Drive north of D... |
20220429200
|
200 |
STPAA-NR13(951) |
40 |
0 |
HALE PERRY |
for constructing the Safety Improvements (Curb Ramp
Installations) on SR-8 (US-80), SR-14, SR-25, SR-61, SR-69,
SR-183, and SR-289 at various locations in the West Central
Region (Tuscaloosa Area) as indicated in the plans. |