20220527001
|
001 |
BR-0005(529) |
121 |
0 |
MARENGO WILCOX |
for constructing the Bridge Replacement (Grading,
Drainage, Pavement, and Bridge) on SR-5 over Mud Creek.
Length 0.577 mi. |
20220527004
|
004 |
ERPR-9072(927) |
97 |
0 |
BALDWIN MOBILE |
for constructing the Traffic Signal and Roadway Lighting
Improvements on SR-16, SR-42, SR-59, SR-161, SR-180,
SR-188, I-165, I-65, and I-10 at various locations in the
Southwest Region (Mobile Area) as indicated in the plans. |
20220527007
|
007 |
HRRR-6022(250) |
17 |
0 |
SUMTER |
for constructing the Guardrail and End Anchor
Installations on CR-27 over Toomsuba Creek northwest of
Cuba. Length 0.114 mi. |
20220527010
|
010 |
IM-I010(349) |
45 |
0 |
MOBILE |
for constructing the Micro-Milling, Resurfacing, and
Traffic Stripe on I-10 from a point 1.360 miles east of the
SR-193 Interchange (MP 18.467) to the Wallace Tunnel (MP
26.651) in Mobile. Length 8.272 mi. |
20220527011
|
011 |
IM-I020(365) |
80 |
1 |
JEFFERSON |
for constructing the Planing, Overlay, and Traffic Stripe
on I-20 from a point east of the 1st Avenue North
Interchange (MP 130.595) in Birmingham to a point east of
the SR-4 (US-78) Interchange (MP 140.154) in Leeds. Length
9.558 mi. |
20220527014
|
014 |
NH-0006(583) |
39 |
0 |
TUSCALOOSA |
for constructing the Planing, Resurfacing, Guardrail
Installation, and Traffic Stripe on the Mainline of SR-6
(US-82) from the intersection of 13th Street East to 0.360
mile north of the junction of SR-215 (Old Montgomery
Highway) in Tuscaloosa. Lengt... |
20220527015
|
015 |
NH-0079(520) |
56 |
0 |
BLOUNT |
for constructing the Micro-Milling, Resurfacing, Guardrail
Installation, and Traffic Stripe on SR-79 from the junction
of Pine Bluff Road in Locust Fork to the junction of SR-53
(US-231) in Cleveland (Site 1) and on SR-160 from the
junction of Odice B... |
20220527016
|
016 |
NH-0157(529) |
37 |
0 |
CULLMAN |
for constructing the Micro-Milling, Resurfacing, and
Traffic Stripe on SR-157 from the junction of SR-74
(US-278) to the intersection of SR-69 in Cullman. Length
0.600 mi. |
20220527018
|
018 |
NH-HSIP-0003(621) |
78 |
0 |
SHELBY |
for constructing the Safety Widening, Planing,
Resurfacing, Access Management, and Traffic Stripe on SR-3
(US-31) from the junction of the I-65 Interchange to the
junction of CR-68 in Alabaster. Length 2.523 mi. |
20220527021
|
021 |
STPAA-0021(577) |
22 |
0 |
ESCAMBIA |
for constructing the Micro-Milling of the existing Open
Graded Friction Course (OGFC) and Traffic Stripe on SR-21
from a point 0.500 mile north of the junction of the I-65
Interchange (MP 8.533) to a point south of the Little River
Bridge at the Monro... |
20220527022
|
022 |
STPAA-0110(506) |
37 |
0 |
MONTGOMERY |
for constructing the Planing, Resurfacing, and Traffic
Stripe on SR-110 from a point 0.370 mile west of the
junction of SR-293 southeast of Montgomery to the Bullock
County Line. Length 6.423 mi. |
20220527023
|
023 |
STPAA-0168(502) |
38 |
0 |
MARSHALL |
for constructing the Micro-Milling, Resurfacing, and
Traffic Stripe on SR-168 from the intersection of Church
Street in Boaz to the DeKalb County Line. Length 4.073 mi. |
20220527024
|
024 |
STPAA-0279(502) |
43 |
0 |
JACKSON |
for constructing the Micro-Milling, Resurfacing, and
Traffic Stripe on SR-279 from the junction of SR-79 to the
junction of South Scott Street in Scottsboro. Length 3.179
mi. |
20220527026
|
026 |
STPAA-HSIP-0004(552) |
51 |
1 |
CALHOUN CLEBURNE |
for constructing the Safety Widening, Micro-Milling,
Resurfacing, Guardrail Installation, and Traffic Stripe on
SR-4 (US-78) from a point 0.383 mile east of the junction
of SR-9 to the junction of SR-46 in Heflin. Length 5.166
mi. |
20220527027
|
027 |
STPAA-HSIP-0015(541) |
93 |
2 |
CHAMBERS |
for constructing the Safety Widening, Micro-Milling,
Resurfacing, Guardrail Installation, and Traffic Stripe on
SR-15 (US-29) from 0.300 mile south of the junction of
Judge Brown Road (MP 204.561) to 1.010 miles south of the
I-85 Overpass in Valley. L... |
20220527028
|
028 |
STPAA-HSIP-0102(533) |
46 |
0 |
FAYETTE |
for constructing the Safety Widening, Micro-Milling,
Resurfacing (Scrub Seal), and Traffic Stripe on SR-102 from
the junction of SR-171 northeast of Fayette to the junction
of Otts Road. Length 4.731 mi. |
20220527031
|
031 |
STPSU-2815(252) |
85 |
1 |
ETOWAH |
for constructing the Roadway Improvements (Reconstruction)
on South 11th Street from the junction of Black Creek
Parkway to a point at Black Creek. Length 0.514 mi. |
20220527034
|
034 |
ATRP2-HSIP-0002(587) |
124 |
0 |
JACKSON |
for constructing the Operational and Intersection
Improvements on SR-2 (US-72) at County Park Road to include
Service Road Extensions in Scottsboro. Length 0.539 mi. |