The letting has ended.
Also Available
Downloads
Notice to Contractors
180817_C01_SupplementalNoticeToContractors.pdf
Notice to Contractors
180817_Notice_To_Contractors.pdf
DBE.BIN File
dbe.bin

Letting of August 17, 2018

Letting information table
Letting ID: 180817
Cut-Off Time: 11:00:59 AM CDT
   

Proposal table
Proposal Call Order Project ID Items Amendments Counties
(14 Active Proposals)
180817-A01 A01 I 35-2(98),ACNHPP 65-4(41) 80 1 CARROLL DAVIESS LINN LIVINGSTON
****(1): Job J1I3192 Route I-35 DAVIESS County. Strip seal gland replacement 3 miles south of Pattonsburg, the total length of improvement being 0.892 miles.****(2): Job J1P3147 Route Various CARROLL, DAVIESS, LINN, LIVINGSTON County. Bridge rehabilit...
180817-A02 A02 I 29-2(184) 40 1 HOLT
****(1): Job J1I3019 Route I-29 HOLT County. Resurface from Davis Creek Bridge to Route 59 Interchange Near Mile Marker 67, the total length of improvement being 16.541 miles.
180817-A04 A04 FAF 24-1(80),(81),2(33),2(34) 150 2 CARROLL CHARITON
****(1): Job J1P3175 Route 24, 65 CARROLL County. Bridge rehabilitation 1.9 miles north of the Missouri River near Carrollton, the total length of improvement being 0.135 miles.****(2): Job J1P3176 Route 24, 65 CARROLL County. Bridge rehabilitation ov...
180817-A05 A05 FAS S101(25),FAS S101(11) 48 1 BUCHANAN HOLT
****(1): Job J1S3076 Route 371 BUCHANAN County. Resurface From Route 752 to Buchanan/Platte Co. Line, the total length of improvement being 13.026 miles.****(2): Job J1S3153 Route 111 HOLT County. Resurface and add shoulders from Route T in Forest Cit...
180817-C01 C01 I-70-1(202),(210),I 435-1(327) 591 2 JACKSON
****(1): Job J4I1597C Route I-70, I-435 JACKSON County. Interchange improvements at the I-70 and I-435 interchange, the total length of improvement being 1.05 miles.****(2): Job J4I3124B Route I-70 JACKSON County. Coldmill and resurface from Mancheste...
180817-C02 C02 FAF-350-1(5) 24 1 JACKSON
****(1): Job J4S3283 Route 350 JACKSON County. Slide repair WB off ramp to 63rd Street, the total length of improvement being 0.112 miles.
180817-D01 D01 J5M0283 7 1 PULASKI
****(1): Job J5M0283 Route I-44 Spur PULASKI County. Pipe repair at Eastlawn Avenue in St. Roberts, the total length of improvement being 0.02 miles.
180817-F01 F01 J6P3355 4 1 ST LOUIS
****(1): Job J6P3355 Route 364 ST LOUIS County. Detention structure clean out at the Bennington Detention Basin, the total length of improvement being 0 miles.
180817-F02 F02 J6S3363, J6S3364 36 3 FRANKLIN
****(1): Job J6S3363 Route VV FRANKLIN County. Resurface between Route 100 and Route E, the total length of improvement being 4.5 miles.****(2): Job J6S3364 Route EE FRANKLIN County. Pavement improvements between Route 50 and the end of maintenance, t...
180817-G01 G01 FAS S601(94) 23 1 TANEY
****(1): Job J7P3142 Route 176, EE TANEY County. Coldmill and resurface from Route 160 W Junction to Route 160 E Junction and from 176 W Junction to 176E Junction, the total length of improvement being 6.155 miles.
180817-G02 G02 FAS S601(47), FAS-S602(037) 57 1 DOUGLAS WEBSTER
****(1): Job J7S3146 Route OO, C, BB DOUGLAS, WEBSTER County. Resurface on Rte. BB from Rte. K to Rte. 14, Rte. C from MO 38 to US 60, Rte. OO from Rte. B to MO 38, the total length of improvement being 24.686 miles.****(2): Job J7S3240 Route NN WEBST...
180817-G03 G03 FAS-S602(034),(035),(036) 39 1 BARTON
****(1): Job J7S3237 Route A BARTON County. Resurface from Route C to Route 160, the total length of improvement being 6.095 miles.****(2): Job J7S3238 Route T BARTON County. Resurface from Route 160 to Route 126, the total length of improvement being...
180817-H01 H01 FAS S702(67) 23 1 REYNOLDS
****(1): Job J9P3509 Route 21 REYNOLDS County. Drainage structure replacement 0.1 mile north of Route 21/106 intersection in Ellington, the total length of improvement being 0.014 miles.
180817-H02 H02 FAF-60-3(118) 35 1 HOWELL
****(1): Job J9S3498 Route Bus 60 HOWELL County. Bridge replacement over Kings Creek, the total length of improvement being 0.061 miles.