Proposal 180119-H05

****(1): Job J9S3067 Route P NEW MADRID County. Bridge replacement over Saint Johns Diversion Ditch, the total length of improvement being 0.058 miles.****(2): Job J9S3223 Route D MISSISSIPPI County. Bridge rehabilitation over Drainage Ditch No. 32, the total length of improvement being 0.09 miles.****(3): Job J9S3230 Route P NEW MADRID County. Bridge replacement over Maple Slough Ditch, the total length of improvement being 0.07 miles.
Proposal information table
Date Generated:12/07/2017Sections: 9
Date Revised: Amendments: 0
Call Order: H05 Highway Number:
Items: 119 Counties: MISSISSIPPI NEW MADRID
Project ID: FAS-S700(24),FAS-S701(010)

You must be logged in to view item data.