Proposal 180817-G03

****(1): Job J7S3237 Route A BARTON County. Resurface from Route C to Route 160, the total length of improvement being 6.095 miles.****(2): Job J7S3238 Route T BARTON County. Resurface from Route 160 to Route 126, the total length of improvement being 6.909 miles.****(3): Job J7S3239 Route K BARTON County. Resurface from Route P to Route 43 at Liberal, the total length of improvement being 4.027 miles.
Proposal information table
Date Generated:08/10/2018Sections: 3
Date Revised: 08/10/2018 Amendments: 1
Call Order: G03 Highway Number:
Items: 39 Counties: BARTON
Project ID: FAS-S602(034),(035),(036)

You must be logged in to view item data.