The letting has ended.
Also Available
Downloads
Bid Authorization Form
Bid Authorization Form.pdf
Notice to Contractors
February Notice.doc
Notice to Contractors
jointnotFeb10.pdf
Notice to Contractors
SupplementalnotFeb10.pdf
DBE.BIN File
tn_dbe.bin

Letting of February 10, 2012

Letting information table
Letting ID: 20120210
Opening Time: 10:00:00 AM CDT
Cut-Off Time: 10:00:00 AM CDT
   

Proposal table
Proposal Call Order Items Amendments Counties
(55 Active Proposals, 9 Withdrawn Proposals)
CNL900 001 140 2 SHELBY
The seismic retrofit of the bridge on I-40 over the Mississippi River (L.M. 0.00). Project Length - 0.000 mile
CNL922 002 113 1 BRADLEY
The grading, drainage, and paving on a S.I.A. route serving Wacker Chemical. Project Length - 1.733 miles
CNL920 003 64 0 CHEATHAM
BH-STP-12(40), 11005-3223-94 The rehabilitation of two (2) bridges on S.R. 12 over Sycamore Creek (L.M. 11.49) and Dry Fork Creek (L.M. 16.41). Project Length - 0.540 mile 11005-4224-04 The repair of the bridge on S.R. 12 over Marks Creek (L.M. 7.72). Pro...
CNL919 004 46 1 GILES
The resurfacing on I-65 using open-graded friction course (OGFC) beginning at the Alabama State Line (L.M. 0.00) and extending to U.S. 64 (S.R. 15) (L.M. 14.08), including bridge deck repair. Project Length - 14.080 miles
CNL918 005 58 0 HAMILTON
The construction of a concrete box beam bridge on Daugherty Ferry Road over Sale Creek (L.M. 0.79), including grading, drainage, and paving. Project Length - 0.072 mile
CNL902 006 39 0 HAMILTON
The resurfacing on I-24 using open-graded friction course (OGFC) beginning at the Georgia State Line (L.M. 0.00) and extending to west of the bridge over Chattanooga Creek (L.M. 6.18), including bridge deck repair. Project Length - 6.180 miles
CNL921 007 41 0 SHELBY
IME-55-1(127), 79005-8162-44 The resurfacing on I-55 beginning at I-240 (L.M. 5.74) and extending to north of Horn Lake Road (L.M. 8.05), including bridge deck repair. Project Length - 2.310 miles IME-240-1(291), 79006-8191-44 The resurfacing on I-240 beg...
CNL082 008 This proposal has been withdrawn
CNL082 has been withdrawn from this letting
CNL083 009 This proposal has been withdrawn
CNL083 has been withdrawn from this letting
CNL074 010 29 0 BENTON
The resurfacing (thin mix overlay) on S.R. 191 beginning at Charlie Creek bridge (L.M. 15.60) and extending to north of Eva-Flatwoods Road (L.M. 20.98). Project Length - 5.380 miles
CNL077 011 44 1 BENTON
The repair of the bridge on U.S. 70 (S.R. 1) over Hunting Creek (L.M. 0.43). Project Length - 0.000 mile
CNL085 012 This proposal has been withdrawn
CNL085 has been withdrawn from this letting
CNL084 013 This proposal has been withdrawn
CNL084 has been withdrawn from this letting
CNL018 014 27 2 BRADLEY, POLK
HSIP-313(4), 06019-3207-94, 06019-4207-04, 70015-4206-04, 70015-3206-94 The resurfacing (microsurfacing) on S.R. 313 beginning at S.R. 74 (L.M. 0.00) in Bradley County and extending to U.S. 411 (S.R. 33) (L.M. 1.79) in Polk County. Project Length - 6.790 ...
CNL030 015 34 CANNON, WARREN
HSIP-64(13), 08048-3219-94 The miscellaneous safety improvements on S.R. 64 (Bradyville Road) near Lassiter Road (L.M. 7.36 to L.M. 7.45). Project Length - 0.090 mile HRRR-145(3), 08950-3202-94 The miscellaneous safety improvements on S.R. 145 beginning a...
CNL031 016 137 2 CARROLL
The grading, drainage, and paving on U.S. 70 (S.R. 1) at the intersection of Baker Road and Voss Road (L.M. 15.67). Project Length - 0.313 mile
CNL034 017 432 3 CARTER
STP-362(8),10016-3215-14 The grading, drainage, construction of retaining walls and paving on S.R. 362 beginning at S.R. 361 (Gap Creek Road) and extending to U.S. 321 (S.R. 67, Elk Avenue). Project Length - 5.898 miles STP-362(9),10016-3216-14 The constr...
CNL005 018 24 CLAY, JACKSON
HSIP-151(4), 44009-3214-94, 44009-4214-04, 14007-3204-94, 14007-4204-04 The resurfacing (microsurfacing) on S.R. 151 beginning at S.R. 56 in Jackson County (L.M. 0.00) and extending to the Macon County line in Clay County (L.M. 1.12). Project Length - 5.0...
CNL037 019 82 0 COCKE
The installation of signals and miscellaneous safety improvements at various intersections in Newport. Project Length - 0.089 mile
CNL068 020 47 1 COCKE
The repair of the bridge on U.S. 321 (S.R. 32) over I-40 (left and right) (L.M. 23.53). Project Length - 0.000 mile
CNL020 021 22 0 CUMBERLAND
The resurfacing on S.R. 68 beginning east of Cox Valley Road (L.M. 5.23) and extending to Alloway Road (L.M. 10.39). Project Length - 5.100 miles
CNL063 022 65 0 DAVIDSON
The repair of the bridge on U.S. 70 (S.R. 24, Lebanon Road) over Browns Creek (L.M. 14.74). Project Length - 0.1412 mile
CNL048 023 19 0 DECATUR
The resurfacing (thin mix overlay) on S.R. 69 beginning at Three Way Road (L.M. 14.58) and extending to S.R. 202 (L.M. 19.73). Project Length - 5.150 miles
CNL019 024 21 DEKALB, OVERTON
STP/HSIP-26(46), 21001-3272-94, 21001-8272-14 The resurfacing (microsurfacing) on U.S. 70 (S.R. 26) beginning west of Brent Taylor Road (L.M. 20.30) and extending to the White County line (L.M. 28.25). Project Length - 7.690 miles STP/HSIP-84(11), 67004-3...
CNL064 025 51 2 DICKSON
BH-IE-40-3(154), 22001-3186-94 The rehabilitation of the bridge on I-40 over Turnbull Creek (L.M. 16.53), including grading, drainage, and paving. Project Length - 0.100 mile 22001-4185-04 The repair of the bridge on I-40 over Nails Creek (L.M. 14.38). Pr...
CNL050 026 21 0 DYER
The resurfacing (thin mix overlay) on S.R. 211 beginning at David Road (L.M. 4.25) and extending to Biffle Road (L.M. 8.87). Project Length - 4.620 miles
CNL049 027 18 0 FAYETTE
The resurfacing (thin mix overlay) on U.S. 64 (S.R. 15) beginning east of Dogwood Lane (L.M. 18.00) and extending to the Hardeman County line (L.M. 27.30). Project Length - 9.300 miles
CNL027 028 33 0 FRANKLIN
The resurfacing on various city streets in Winchester. Project Length - 4.111 miles
CNL004 029 18 FRANKLIN, COFFEE
The resurfacing (either microsurface or thin mix overlay) on S.R. 127 beginning at Farm Lane Road in Franklin County (L.M. 5.21) and extending to U.S. 41 (S.R. 2) (L.M. 5.89) in Coffee County. Project Length - 9.930 miles
CNL025 030 This proposal has been withdrawn
CNL025 Has Been Withdrawn From The Letting
CNL076 031 31 0 GIBSON
The repair of the bridge on S.R. 152 over Dry Branch (L.M. 15.22). Project Length - 0.000 mile
CNL070 032 30 0 GRAINGER
STP/HSIP-1(287), 29001-8229-14, 29001-3229-94 The resurfacing on U.S. 11W (S.R. 1) beginning approximately 425' west of West Hills Road (L.M. 14.10) and extending to Water Street (L.M. 16.10). Project Length - 2.000 miles STP/HSIP-NHE-1(286), 29002-8242-1...
CNL036 033 38 GRAINGER, KNOX
STP-SIP-32(75), 29004-3239-94 The miscellaneous safety improvements at the intersection of U.S. 25E (S.R. 32) and S.R. 131 (L.M. 13.20). Project Length - 0.000 mile HRRR-375(7), 29030-3225-94 The miscellaneous safety improvements on S.R. 375 beginning at ...
CNL079 034 22 0 GREENE
The resurfacing on S.R. 70 beginning at the North Carolina State line (L.M. 0.00) and extending to south of Cecil Davis Road (L.M. 3.40). Project Length - 3.400 miles
CNL044 035 12 0 HARDEMAN
The resurfacing on various city streets in Bolivar. Project Length - 2.000 miles
CNL053 036 18 0 HOUSTON
The resurfacing (thin mix overlay) on S.R. 147 beginning east of Hill Orchard Cemetery Lane (L.M. 6.20) and extending to S.R. 49 (L.M. 12.40). Project Length - 6.200 miles
CNL038 037 87 0 JEFFERSON
IM-40-8(146), 45001-3160-44 The grading, drainage, and paving on I-40 at the interchange to I-81. Project Length - 0.751 mile IM-81-1(115), 45003-3129-44 The grading, drainage, and paving on I-81 southbound at the rest area (Mile Marker 2). Project Length...
CNL067 038 This proposal has been withdrawn
No Bids Recieved
CNL032 039 82 2 KNOX
The grading, drainage, and paving on the I-140 westbound on/off ramps at S.R. 332 (Northshore Drive). Project Length - 0.276 mile
CNL001 040 385 2 KNOX
The grading, drainage, construction of a concrete Bulb-Tee beam bridge and paving on S.R. 131 beginning east of U.S. 25W (S.R. 9, Clinton Highway) and extending to south of Gill Road. Project Length - 3.528 kilometers *METRIC*
CNL016 041 15 0 LAWRENCE
The resurfacing (microsurfacing) on S.R. 242 beginning at North College Street (L.M. 9.00) extending to south of the bridge over Crews Branch (L.M. 16.00). Project Length - 7.000 miles
CNL060 042 28 1 MAURY
The resurfacing (either microsurface or thin mix overlay) on S.R. 373 beginning at S.R. 50 (L.M. 0.00) and extending to the Marshall County line (L.M. 8.21). Project Length - 8.210 miles
CNL081 043 336 0 MCMINN
The grading, drainage, construction of a concrete box beam bridge, retaining wall and paving on S.R. 30 beginning at County Road 609 and extending to the 4-lane section in Etowah. Project Length - 3.778 miles
CNL029 044 23 1 MCMINN, BRADLEY
HRRR-163(5), 54023-3207-94 The miscellaneous safety improvements on S.R. 163 beginning at Piney Grove Road (L.M. 9.21) and extending to Coghill Road (L.M. 13.67). Project Length - 4.460 miles HRRR-1231(2), 54022-3417-94 The miscellaneous safety improvemen...
CNL043 045 30 1 MCNAIRY
The resurfacing on U.S. 45 (S.R. 5) beginning south of Allen McCoy Road (L.M. 4.36) and extending to U.S. 64 (S.R. 15) (L.M. 11.78), including bridge deck repair. Project Length - 7.420 miles
CNL071 046 24 1 MORGAN
The resurfacing on S.R. 62 beginning at S.R. 116 (L.M. 27.80) and extending to the Roane County line (L.M. 35.73). Project Length - 7.930 miles
CNL045 047 This proposal has been withdrawn
CNL045 Has Been Withdrawn From The Letting
CNL003 048 21 PUTNAM, OVERTON
The resurfacing on S.R 111 beginning at Spring Creek Road (L.M. 12.52) in Putnam County and extending to S.R. 293 (L.M. 3.18) in Overton County. Project Length - 3.620 miles
CNL078 049 This proposal has been withdrawn
CNL084 Has Been Withdrawn From The Letting
CNL054 050 20 ROBERTSON, SUMNER
The resurfacing (thin mix overlay) on S.R. 257 beginning at U.S. 41 (S.R. 11) (L.M. 11.80) in Robertson County and extending to U.S. 31W (S.R. 41) (L.M. 0.22) in Sumner County, including bridge deck repair. Project Length - 6.220 miles
CNL055 051 32 0 RUTHERFORD
The resurfacing on S.R. 1 beginning north of S.R. 268 (Thompson Lane) (L.M. 14.10) and extending to U.S. 41 (S.R. 2) (L.M. 17.63). Project Length - 3.160 miles
CNL041 052 462 3 SEVIER
The grading, drainage, construction of a welded steel plate girder bridge and paving on S.R. 66 beginning at S.R. 338W (Boyd’s Creek Highway) and extending to S.R. 139 (Douglas Dam Road). Project Length - 3.578 kilometers * METRIC *
CNL046 053 This proposal has been withdrawn
No Bids
CNL087 054 3 0 STEWART
The retracing of painted pavement markings on various routes in Land Between the Lakes National Recreation Area. Project Length - 27.930 miles
CNL013 055 11 2 STEWART
The full depth reclamation, and paving with bituminous seal coat on Lake Front Road (LBL Route 206) beginning at Fort Henry Road and extending to Rushing Creek Road (LBL Route 172) in Land Between the Lakes National Recreation Area. Project Length - 16.90...
CNL042 056 21 0 SULLIVAN
BH-STP-394(15), 82099-3218-94 The rehabilitation of the bridge on S.R. 394 over Reedy Creek (L.M. 0.06), including grading, drainage, and paving. BH-STP-37(15), 82007-3224-94 The rehabilitation of the bridge on U.S. 19E (S.R. 37) over Indian Creek (L.M. 1...
CNL058 057 15 1 SUMNER
The resurfacing on S.R. 109 beginning south of Gayla Court (L.M. 20.00) and extending to U.S. 31W (S.R. 41) (L.M. 23.42). Project Length - 3.420 miles
CNL026 058 80 0 TIPTON
STP-M-NHE-3(107), 84102-3205-54 The grading, drainage, and paving on U.S. 51 (S.R. 3) at the intersection of Charles Smith Street in Covington (L.M. 20.19). Project Length - 0.154 mile 84950-3557-04 The grading, drainage, and paving on a S.I.A. route serv...
CNL072 059 24 1 UNION, CLAIBORNE
The resurfacing on S.R. 33 beginning south of S.R. 61 in Union County (L.M. 9.79) and extending into Claiborne County to north of Sharps Chapel Road (L.M. 0.08). Project Length - 5.450 miles
CNL047 060 25 0 WEAKLEY
The resurfacing on U.S. 45E (S.R. 43) beginning at Old S.R. 43 (L.M. 6.98) and extending to the ramp to S.R. 216 (L.M. 14.45), including bridge deck repair. Project Length - 7.470 miles
CNL056 061 24 0 WILLIAMSON
The resurfacing (either microsurface or thin mix overlay) on S.R. 11 beginning at the Rutherford County line (L.M. 0.00) and extending to S.R. 96 (L.M. 7.41). Project Length - 7.410 miles
CNL057 062 32 0 WILLIAMSON
The resurfacing on S.R. 397 beginning at U.S. 31 (S.R. 6) (L.M. 5.70) and extending to U.S. 431 (S.R. 106) (L.M. 7.37). Project Length - 1.670 miles
CNL073 063 17 0 WILLIAMSON
The repair of the bridge on S.R. 248 over Five Mile Creek (L.M. 3.46). Project Length - 0.020 mile
CNL923 064 4 WILLIAMSON, DAVIDSON
The mowing and litter removal on various Interstate and State Routes. Project Length - 178.490 miles