The letting has ended.
Also Available
Downloads
Bid Authorization Form
Bid Authorization Form.pdf
Instructions To Bidders
ISB_Sept14.pdf
Notice to Contractors
notSept14.pdf
DBE.BIN File
tn_dbe.bin

Letting of September 14, 2012

Letting information table
Letting ID: 20120914
Opening Time: 10:00:00 AM CDT
Cut-Off Time: 10:00:00 AM CDT
   

Proposal table
Proposal Call Order Items Amendments Counties
(38 Active Proposals, 3 Withdrawn Proposals)
CNL234 001 19 0 ANDERSON
The miscellaneous safety improvements on various local roads in Anderson County. Project Length - 20.690 miles
CNL318 002 91 0 ANDERSON
The grading, drainage, and paving on a S.I.A. route serving USEC, Incorporated in Oak Ridge. Project Length - 0.278 mile
CNL279 003 15 ANDERSON, BLOUNT, CAMPBELL, CARTER
The random on-call cable barrier repair on various Interstate and State Routes. Project Length - 0.000 mile
CNL281 004 16 BENTON, CROCKETT, DECATUR, DYER
The random on-call cable barrier repair on various Interstate and State Routes. Project Length - 0.000 mile
CNL280 005 15 BRADLEY, COFFEE, CUMBERLAND, GRUNDY
The random on-call cable barrier repair on various Interstate and State Routes. Project Length - 0.000 mile
CNL307 006 35 0 CAMPBELL
The resurfacing on I-75 beginning south of the Rarity Mountain Road underpass (L.M. 24.48 NB and L.M. 25.68 SB) and extending to the Kentucky State line (L.M. 31.64). Project Length - 6.560 miles
CNL299 007 40 1 CARTER, WASHINGTON
IME-26(50), 10001-8112-44 The resurfacing using open-graded friction course (OGFC) on I-26 beginning at the Washington County line (L.M. 0.00) and extending to the Unicoi County line (L.M. 2.69). Project Length - 2.690 miles IME-26(49), 90085-8165-44 The ...
CNL293 008 15 CHEATHAM, DAVIDSON, DICKSON, GILES
The random on-call cable barrier repair on various Interstate and State Routes. Project Length - 0.000 mile
CNL298 009 23 CUMBERLAND, PUTNAM
HRRR-24(45), 18004-3225-94 The miscellaneous safety improvements on U.S. 70N (S.R. 24) beginning west of Pomona Road (L.M. 11.00) and extending to east of Kidwell Lane (L.M. 12.40). Project Length - 1.400 miles HRRR-24(46), 18004-3224-94 The miscellaneous...
CNL287 010 49 3 DAVIDSON
The resurfacing using open-graded friction course (OGFC) on I-24 beginning east of I-440 (L.M. 17.51) and extending to west of Haywood Lane (L.M. 21.10). Project Length - 3.541 miles
CNL289 011 48 3 DAVIDSON
The resurfacing on S.R. 12 beginning at S.R. 155 (Briley Parkway) (L.M. 6.49) and extending to the Cheatham County line (L.M. 13.27), including bridge deck repair. Project Length - 6.780 miles
CNL290 012 48 0 DAVIDSON
The resurfacing on S.R.254 beginning at Blue Hole Road (L.M. 13.27) and extending to S.R. 1 (Murfreesboro Road) (L.M. 17.28), including bridge deck repair. Project Length - 3.310 miles
CNL313 013 3 DICKSON, GILES, HICKMAN, HUMPHREYS
The longitudinal joint stabilization on various Interstate and State Routes. Project Length - 0.000 mile
CNL024 014 256 4 FAYETTE, SHELBY
The grading, drainage, construction of three (3) welded steel plate girder bridges, two (2) concrete Bulb-Tee beam bridges and paving on I-269 beginning at the Mississippi State line and extending to S.R. 385. Project Length - 2.667 miles
CNL276 015 19 0 FRANKLIN
The installation of signals at the intersection of S.R. 433 and Blue Springs Road in Decherd (L.M. 7.18). Project Length - 0.000 mile
CNL295 016 32 1 GREENE
The resurfacing using open-graded friction course (OGFC) on I-81 beginning south of the Earl Baxter Road overpass (L.M. 27.60) and extending to the Washington County line (L.M. 32.06), including bridge deck repair. Project Length - 4.460 miles
CNL309 017 34 1 HAMBLEN
The improvement of the intersection on U.S. 25E (S.R. 32) at Morelock Road in Morristown (L.M. 7.28 to L.M. 7.45). Project Length - 0.151 mile
CNL300 018 94 0 HAMILTON
The miscellaneous safety improvements on I-75 at the northbound off-ramp to S.R. 320 (East Brainerd Road), exit 3A. Project Length - 0.097 mile
CNL292 019 31 0 HAMILTON
IME-24-3(88), 33003-8163-44 The resurfacing using open-graded friction course (OGFC) on I-24 beginning west of Spring Creek Road (L.M. 14.02) and extending to I-75 (L.M. 14.71). Project Length - 0.690 mile IME-75-1(134), 33004-8143-44 The resurfacing usin...
CNL302 020 123 2 HANCOCK
The construction of a welded steel plate girder bridge on S.R. 70 over the Clinch River, including grading, drainage, and paving, and repair of the existing bridge (L.M. 1.65). Project Length - 0.346 mile
CNL303 021 27 1 HAYWOOD
The resurfacing using open-graded friction course (OGFC) on I-40 beginning west of Mercer Road (L.M. 16.74) and extending to the Madison County line (L.M. 23.89), including expansion joint repairs. Project Length - 7.150 miles
CNL301 022 This proposal has been withdrawn
CNL301 Has been withdrawn from this letting.
CNL187 023 This proposal has been withdrawn
CNL187 Has been withdrawn from this letting.
CNL296 024 39 0 JEFFERSON
The resurfacing on I-40 beginning at the Sevier County line (L.M. 0.00) and extending to east of U.S. 25W (U.S. 70, S.R. 9) (L.M. 6.00). Project Length - 6.000 miles
CNL308 025 43 0 KNOX
The resurfacing on I-640 beginning west of S.R. 33 (L.M. 2.02 WB, L.M. 2.11 EB) and extending to I-40 (L.M. 7.04). Project Length - 4.970 miles
CNL314 026 28 0 KNOX
The drainage improvements on I-40 eastbound at various locations between log miles 23.45 and 24.99. Project Length - 1.540 miles
CNL288 027 22 0 MARION
The resurfacing using open-graded friction course on I-24 beginning east of Big Fiery Gizzard Creek (L.M. 11.48) and extending to U.S. 72 (S.R. 27) (L.M. 17.17). Project Length - 5.690 miles
CNL312 028 40 3 MARSHALL
The resurfacing using open-graded friction course (OGFC) on I-65 beginning at the Giles County line (L.M. 0.00) and extending to the Maury County line (L.M. 12.80), including bridge deck and expansion joint repairs. Project Length - 12.800 miles
CNL316 029 41 1 MONTGOMERY
The resurfacing using open-graded friction course (OGFC) on I-24 beginning at S.R. 76 (L.M. 10.62) and extending to the Robertson County line (L.M. 17.20), including bridge deck repair. Project Length - 6.580 miles
CNL283 030 34 0 PUTNAM
The resurfacing on I-40 beginning east of S.R. 56 (L.M. 6.78, Exit 273) and extending to east of S.R. 56 (L.M. 14.05, Exit 280), including bridge deck repair. Project Length - 7.270 miles
CNL273 031 62 0 SCOTT
The repair of three (3) bridges on U.S. 27 (S.R. 29) over CNO & TP Railroad (L.M. 22.53), branch (L.M. 24.81), and Roaring Paunch Creek (L.M. 25.79). Project Length - 0.000 mile
CNL315 032 31 0 SEVIER
The grading, drainage, and paving on U.S. 411 (U.S. 441, S.R. 35) at the intersections of White School Road (L.M. 9.81 and L.M. 10.68). Project Length - 0.190 mile
CNL304 033 26 2 SHELBY
The resurfacing on I-240 beginning east of I-55 (L.M. 5.70) and extending to east of Perkins Road (L.M. 12.33). Project Length - 6.630 miles
CNL297 034 22 2 SHELBY
The repair of the bridge on I-55 over Cane Creek (L.M. 6.47). Project Length - 0.000 mile
CNL282 035 27 1 SHELBY
The repair of the bridge on U.S. 51 (S.R. 1, Danny Thomas Boulevard) over I-40 in Memphis (L.M. 3.11). Project Length - 0.000 mile
CNL012 036 125 1 SMITH
The construction of a concrete Bulb-Tee beam bridge on U.S. 70N (S.R. 24) over the Caney Fork River (L.M. 13.38), including grading, drainage, and paving. Project Length - 0.639 mile
CNL278 037 42 0 TIPTON
The repair of the bridge on U.S. 51 (S.R. 3) northbound over Big Creek (L.M. 1.66). Project Length - 0.000 mile
CNL317 038 This proposal has been withdrawn
CNL317 Has been withdrawn from this letting. “Prime contractors that submitted the required Pre-Qualification Submittals by the September 4, 2012 deadline will be notified of their qualification status by Wednesday, September 19, 2012.”
CNL206 039 15 0 UNION
The installation of flashing speed limit signals on S.R. 33 at Paulette Elementary School. Project Length - 0.000 mile
CNL277 040 19 1 WASHINGTON
The miscellaneous safety improvements on various local roads in Washington County. Project Length - 25.910 miles
CNL257 041 25 0 WILLIAMSON
The traffic signal interconnect on S.R. 253 (Concord Road) beginning at Wilson Pike (L.M. 1.72) and extending to Sunset Road (L.M. 4.92). Project Length - 3.202 miles