Letting of May 24, 2013

Letting information table
Letting ID: 20130524
Opening Time: 10:00:00 AM CDT
Cut-Off Time: 10:00:00 AM CDT
   

Proposal table
Proposal Call Order Items Amendments Counties
(96 Active Proposals, 1 Withdrawn Proposal)
CNM918 001 34 0 DAVIDSON
The resurfacing on U.S. 431 (S.R. 65) beginning south of Eatons Creek Road (L.M. 10.60) and extending to the Robertson County line (L.M. 16.01). Project Length - 5.370 miles
CNM920 002 37 0 SULLIVAN
The resurfacing on U.S. 11W (S.R. 1) beginning at Fairmont Avenue (L.M. 2.46) and extending to east of Brookside Drive (L.M. 5.60). Project Length - 3.140 miles
CNM174 003 33 0 ANDERSON
The repair of the bridge on I-75 over the Norfolk Southern Railroad (L.M. 11.58). Project Length - 0.000 mile
CNM238 004 170 ANDERSON, BLOUNT, CAMPBELL, CARTER
The random on-call attenuator repair on various Interstate and State Routes. Project Length - 0.000 mile
CNM166 005 30 0 BEDFORD
The resurfacing on U.S. 231 (S.R. 10) beginning at Moreland Avenue (L.M. 12.26) and extending to S.R. 82 (L.M. 17.51), including bridge deck repair. Project Length - 5.200 miles
CNM250 006 3 1 BEDFORD, DAVIDSON, DICKSON, GILES
The crack sealing at various locations on various State Routes. Project Length - 0.000 mile
CNM249 007 3 BEDFORD, DAVIDSON, MACON, MAURY
The longitudinal joint stabilization on various State Routes. Project Length - 0.000 miles
CNM205 008 21 0 BENTON
HSIP-69(82), 03007-3222-94, 03007-4222-04 The resurfacing (thin mix overlay) on S.R. 69A beginning at Prince Road (L.M. 7.28) and extending to the Henry County line (L.M. 14.58). Project Length - 7.300 miles HSIP-69(81), 03005-3218-94, 03005-4218-04 The r...
CNM237 009 171 BENTON, CARROLL, CHESTER, GIBSON
The random on-call attenuator repair on various Interstate and State Routes. Project Length - 0.000 mile
CNM202 010 17 0 BLEDSOE
The resurfacing on S.R. 101 beginning at S.R. 30 (L.M. 0.00) and extending to S.R. 285 (L.M. 4.54). Project Length - 4.540 miles
CNM228 011 12 0 BLEDSOE
The miscellaneous safety improvements on Lowes Gap Road beginning at S.R. 28 and extending to Summer City Road. Project Length - 6.400 miles
CNM025 012 34 0 BLOUNT
The slope stabilization on U.S. 129 (S.R. 115) at log mile 9.50. Project Length - 0.066 mile
CNM216 013 21 0 BRADLEY
The resurfacing on U.S. 11 (U.S. 64, S.R. 2) beginning at the Hamilton County line (L.M. 0.00) and extending to east of Boss Road (L.M. 6.29). Project Length - 6.290 miles
CNM204 014 15 0 BRADLEY
The resurfacing (thin mix overlay) on S.R. 306 beginning at S.R. 60 (L.M. 0.00) and extending to south of S.R. 308 (L.M. 5.53). Project Length - 5.530 miles
CNM118 015 296 1 BRADLEY
The grading, drainage, construction of a concrete Bulb-Tee beam bridge and paving on I-75 at the interchange of U.S. 74 (S.R. 311, Pleasant Grove Road) (L.M. 4.86) in Cleveland. Project Length - 1.381 miles
CNM106 016 136 2 BRADLEY
The grading, drainage, and paving on a S.I.A. route (Benton Pike and Durkee Road) serving Whirlpool Corporation. Project Length - 1.815 miles
CNM229 017 170 1 BRADLEY, DEKALB, HAMILTON, MARION
The random on-call attenuator repair on various Interstate and State Routes. Project Length - 0.000 mile
CNM210 018 3 CANNON, COFFEE, CUMBERLAND, DEKALB
The longitudinal joint stabilization on various State Routes. Project Length - 204.090 miles
CNM225 019 21 CANNON, WARREN
HSIP-1(299), 08001-3244-94, 08001-4244-04 The resurfacing (thin mix overlay) on U.S. 70S (S.R. 1) beginning near Billy West Road (L.M. 11.28) and extending to the Warren County line (L.M. 14.93). Project Length - 3.650 miles HSIP-1(300), 89001-3232-94, 89...
CNM004 020 83 0 CARTER
The improvement of the intersection on U.S. 321 (S.R. 91, S.R. 67) at Williams Avenue and on S.R. 91 at Judge Ben Allen Road/Don Lewis Road in Elizabethton. Project Length - 0.000 mile
CNM168 021 18 0 CHEATHAM
The miscellaneous safety improvements on S.R. 12 beginning east of Caldwell Road (L.M. 0.72) and extending to McQuarry Street (L.M. 5.85). Project Length - 5.130 miles
CNM184 022 15 0 CHEATHAM
The resurfacing (thin mix overlay) on S.R. 249 beginning at U.S. 70 (S.R. 1) (L.M. 2.78) and extending to the bridge over Sams Creek (L.M. 7.87). Project Length - 5.090 miles
CNM226 023 30 0 CHESTER
HSIP-100(59), 12006-3217-94, 12006-4217-04 The resurfacing (thin mix overlay) on S.R 100 beginning at S.R. 225 (L.M. 7.78) and extending to Old Montezuma Road (L.M. 10.25). Project Length - 2.470 miles HSIP-365(10), 12002-3211-94, 12002-4211-04 The resurf...
CNM227 024 30 1 COCKE
The resurfacing on S.R. 107 beginning at Blue Mill Road (L.M. 0.00) and extending to the Greene County line (L.M. 11.62). Project Length - 11.620 miles
CNM232 025 26 COCKE, JEFFERSON
HRRR/HSIP-1500(54), 15946-3429-94 The miscellaneous safety improvements on various local routes in Cocke County. Project Length - 0.000 mile HRRR/HSIP-4500(27), 45945-3486-94 The miscellaneous safety improvements on various local routes in Jefferson Coun...
CNM223 026 19 COFFEE, CANNON
HSIP-64(16), 16025-3208-94, 16025-4208-04 The resurfacing (thin mix overlay) on S.R. 64 beginning at the Bedford County line (L.M. 0.00) and extending to the Cannon County line (L.M. 6.36). Project Length - 6.330 miles HSIP-64(17), 08048-3220-94, 08048-42...
CNM164 027 52 1 DAVIDSON
The resurfacing on U.S. 41/70S (S.R. 1) beginning at Rural Hill Road (L.M. 27.81) and extending to the Rutherford County line (L.M. 32.25). Project Length - 4.440 miles
CNM093 028 55 1 DAVIDSON
The miscellaneous safety improvements on U.S. 431 (S.R. 106, 21st Avenue) at the intersections of Children’s Way and Capers Avenue (L.M. 7.55). Project Length - 0.000 mile
CNM157 029 54 1 DAVIDSON
STP/HSIP-11(65), 19030-3216-94, 19030-8216-14 The resurfacing on U.S. 31W/41 (S.R. 11) beginning at Trinity Lane (L.M. 14.90) and extending to S.R. 155 (Briley Parkway) (L.M. 17.44). Project Length - 2.460 miles STP/HSIP-65(15), 19043-3235-94, 19043-8235-...
CNM187 030 33 1 DAVIDSON
The resurfacing on S.R. 255 beginning at U.S. 41/70S (S.R. 1) (L.M. 6.68) and extending to Royal Parkway (L.M. 9.55), including bridge deck and expansion joint repairs. Project Length - 2.870 miles
CNM221 031 6 1 DAVIDSON, DICKSON, SUMNER, WILLIAMSON
The Nashville Smartway Intelligent Transportation System (ITS) Maintenance (2013-2015). Project Length - 0.000 mile
CNM158 032 171 2 DAVIDSON, HUMPHREYS, MAURY, ROBERTSON
The random on-call attenuator repair on various Interstate and State Routes. Project Length - 0.000 mile
CNM002 033 88 DAVIDSON, RUTHERFORD
The Nashville Smartway (ITS) Intelligent Transportation System expansion on I-24 and S.R. 840 beginning east of Haywood Lane in Davidson County and extending to east of Joe B. Jackson Parkway in Rutherford County. Project Length - 36.516 miles
CNM028 034 16 1 DAVIDSON, RUTHERFORD, SHELBY, WILLIAMSON
The removal and replacement of HOV signing and white thermoplastic markings on various Interstate routes. Project Length - 64.400 miles
CNM163 035 25 0 DICKSON
The resurfacing (thin mix overlay) on S.R. 48 beginning at S.R. 49 (L.M. 17.56) and extending to the Montgomery County line (L.M. 27.76). Project Length - 9.490 miles
CNM213 036 19 0 FRANKLIN
The resurfacing (either microsurface or thin mix overlay) on S.R. 121 beginning at the Lincoln County line (L.M. 0.00) and extending to S.R. 50 (L.M. 8.65). Project Length - 8.650 miles
CNM208 037 20 0 FRANKLIN
The resurfacing (thin mix overlay) on S.R. 476 beginning at S.R. 50 (L.M. 0.00) and extending to Chestnut Ridge Road (L.M. 6.30). Project Length - 6.300 miles
CNM234 038 19 0 GREENE
The resurfacing (thin mix overlay) on S.R 70 beginning at West Allens Bridge Road (L.M. 9.98) and extending to U.S. 321 (S.R. 35) (L.M. 15.09). Project Length - 5.110 miles
CNM218 039 11 0 GRUNDY
The resurfacing (thin mix overlay) on U.S. 41 (S.R 2) beginning at Laynes Cove Road (L.M. 4.75) and extending to the Marion County line (West College Street) (L.M. 8.25). Project Length - 3.500 miles
CNM144 040 94 0 HAMBLEN
The grading, drainage, and paving on U.S. 11E (S.R. 34) at the interchange of U.S. 25E (S.R. 32), in Morristown. Project Length - 0.000 mile
CNM217 041 21 0 HAMILTON
The resurfacing on S.R 312 beginning at S.R. 58 (L.M. 14.27) and extending to the Bradley County line (L.M. 17.75). Project Length - 3.480 miles
CNM102 042 37 1 HAMILTON
The resurfacing on U.S. 27 (S.R. 27) beginning at Foust Street (L.M. 5.62) and extending to the Georgia State line (L.M. 7.93). Project Length - 2.310 miles
CNM139 043 144 2 HAMILTON
The construction of a S.I.A. route serving Volkswagen Group of America, including grading, drainage, and paving. Project Length - 1.360 miles
CNM195 044 104 2 HAMILTON, BRADLEY
The Chattanooga Smartway Intelligent Transportation System (ITS) expansion on I-75. Project Length - 11.400 miles
CNM206 045 35 0 HARDEMAN
HSIP-15(173), 35001-3267-94, 35001-4267-04 The resurfacing (thin mix overlay) on U.S. 64 (S.R. 15) beginning at the Fayette County line (L.M. 0.00) and extending to the bridge over Clear Creek (L.M. 4.40). Project Length - 4.400 miles HSIP-100(61), 35006-...
CNM240 046 18 0 HARDEMAN
The resurfacing (thin mix overlay) on S.R. 57 beginning at S.R. 125 (L.M. 17.58) and extending to the McNairy County line (L.M. 24.11). Project Length - 6.520 miles
CNM241 047 19 0 HAWKINS
The resurfacing (thin mix overlay) on U.S. 11W (S.R. 1) beginning at West Main Street (L.M. 14.92) and extending to west of S.R. 70 (L.M. 18.00). Project Length - 3.080 miles
CNM247 048 This proposal has been withdrawn
CNM247 Has Been Withdrawn From This Letting
CNM176 049 29 2 HENDERSON
The repair of the bridge on S.R. 22 over I-40 (L.M. 21.12). Project Length - 0.000 mile
CNM251 050 38 1 HENDERSON
The repair of the bridge on S.R. 104 over the Beech River (L.M. 18.20). Project Length - 0.000 mile
CNM189 051 30 3 HICKMAN
The resurfacing on S.R. 48 beginning at S.R. 100 (L.M. 6.50) and extending to Webb Avenue at the Town Square (L.M. 12.93). Project Length - 6.200 miles
CNM159 052 24 0 HICKMAN
The resurfacing on S.R. 7 beginning at the Maury County line (L.M. 0.0) and extending to North Lick Creek Road (L.M. 8.10), including bridge deck repair. Project Length - 8.100 miles
CNM109 053 35 0 HUMPHREYS
STP/HSIP-1(305), 43004-3222-94, 43004-8222-14 The resurfacing on U.S. 70 (S.R. 1) beginning at William J. Peeler Road (L.M. 20.30) and extending to the Dickson County line (L.M. 27.55). Project Length - 7.200 miles STP/HSIP-13(48), 43066-4201-04, 43066-3...
CNM214 054 16 0 JACKSON
The resurfacing (thin mix overlay) on S.R 135 beginning at the Putnam County line (L.M. 0.00) and extending to south of Spring Creek Road (L.M. 7.69). Project Length - 7.690 miles
CNM248 055 13 0 JEFFERSON
The resurfacing (thin mix overlay) on S.R 66 beginning at U.S. 25W (U.S. 70, S.R. 9) (L.M. 0.00) and extending to the Hamblen County line (L.M. 10.78). Project Length - 10.780 miles
CNM089 056 459 1 JEFFERSON, HAMBLEN
The grading, drainage, construction of a concrete Bulb-Tee beam bridge, a concrete I-beam bridge, and paving on S.R. 66 beginning north of I-81 at S.R. 341 in Jefferson County and extending to S.R. 160 in Morristown. Project Length - 5.211 miles
CNM193 057 56 0 KNOX
The miscellaneous safety improvements on Strawberry Plains Pike at the intersection of Brakebill Road (L.M. 8.80). Project Length - 0.119 mile
CNM239 058 21 0 KNOX
The resurfacing (thin mix overlay) on S.R 131 beginning at S.R. 331 (L.M. 25.18) and extending to the Union County line (L.M. 29.56). Project Length - 4.380 miles
CNM198 059 129 2 KNOX, LOUDON, ROANE
NH-I-098-1(14), 98017-3132-44 The Knoxville Smartway Intelligent Transportation System (ITS) expansion on I-40 and I-75. Project Length - 28.400 miles NH-I-098-1(15), 47954-3140-44 The Knoxville Smartway Intelligent Transportation System (ITS) communicati...
CNM185 060 20 LINCOLN, MOORE
The resurfacing (thin mix overlay) on U.S. 231 (S.R. 10) beginning north of Cold Springs Road (L.M. 19.60) and extending to the Bedford County line (L.M. 1.65). Project Length - 7.930 miles
CNM243 061 23 0 LOUDON
The miscellaneous safety improvements on various local routes in Loudon County. Project Length - 0.000 mile
CNM244 062 50 0 LOUDON
The construction of a S.I.A. route serving the Del Conca facility in the Sugar Limb Industrial Park. Project Length - 0.479 mile
CNM188 063 19 MACON, TROUSDALE
HSIP-151(5), 56009-4211-04, 56009-3211-94 The resurfacing (thin mix overlay) on S.R 151 beginning at the Clay County line (L.M. 0.00) and extending to S.R. 56 (L.M. 2.59). Project Length - 2.590 miles HSIP-141(31), 85006-3209-94, 85006-4209-04 The resurfa...
CNM245 064 22 0 MADISON
The repair of the bridge on Old Medina Road (Campbell Street) over I-40 (L.M. 2.78). Project Length - 0.000 mile
CNM209 065 13 0 MARION
The resurfacing on U.S. 41 (U.S. 64, U.S. 72, S.R 2) beginning at McBrien Lane (L.M. 27.44) and extending to the Hamilton County line (L.M. 33.92). Project Length - 6.480 miles
CNM018 066 61 0 MARSHALL
The repair of the bridge on S.R. 272 over the Duck River (L.M. 17.91). Project Length - 0.143 mile
CNM011 067 135 1 MARSHALL, MAURY
BR-STP-106(12), 59011-3215-94 The construction of a welded steel plate girder bridge on U.S. 431 (S.R. 106, Franklin Pike) over the Duck River (L.M. 1.91), including grading, drainage, and paving. Project Length - 0.333 mile 60014-3215-04 The grading, dra...
CNM162 068 24 0 MAURY
The resurfacing on S.R. 243 beginning west of Redwood Circle (L.M. 5.00) and extending to S.R. 50 (L.M. 10.46). Project Length - 5.440 miles
CNM186 069 24 0 MAURY
The resurfacing (thin mix overlay) on S.R. 50 beginning at Seavy Hight Road (L.M. 24.01) and extending to the Marshall County line (L.M. 28.33). Project Length - 4.250 miles
CNM207 070 21 1 MCNAIRY
The resurfacing (thin mix overlay) on S.R 22 beginning at S.R. 57 (L.M. 7.66) and extending to the Hardin County line (L.M. 10.44). Project Length - 2.780 miles
CNM203 071 23 0 MEIGS
The resurfacing on S.R 58 beginning south of Ratledge Road and Heird Road (L.M. 22.40) and extending to north of S.R. 68 (L.M. 26.92). Project Length - 4.520 miles
CNM160 072 35 0 MONTGOMERY
The resurfacing on S.R. 12 beginning at Big McAdoo Creek (L.M. 5.30) and extending to the junction of S.R. 76 and U.S. 41A (L.M. 8.43). Project Length - 3.130 miles
CNM182 073 24 0 MOORE
The miscellaneous safety improvements on S.R. 130 at the intersection of Five Points Road and Ledford Mill Road (L.M. 1.18). Project Length - 0.000 mile
CNM246 074 31 0 MORGAN
The miscellaneous safety improvements on U.S. 27 (S.R. 29) at the intersection of Mill Street, in Wartburg. Project Length - 0.129 mile
CNM211 075 24 0 OVERTON
The resurfacing on S.R. 111 beginning at S.R. 293 (L.M. 3.18) and extending to south of Howard Road (L.M. 6.65). Project Length - 3.470 miles
CNM219 076 19 0 POLK
HSIP-68(38), 70006-3241-94, 70006-4241-04 The resurfacing (thin mix overlay) on S.R. 68 beginning at S.R. 123 (L.M. 8.89) and extending to Stansbury Road (L.M. 13.91). Project Length - 5.000 miles HSIP-123(1), 70009-3206-94, 70009-4206-04 The resurfacing ...
CNM215 077 13 0 PUTNAM
The resurfacing on S.R 136 beginning north of Whiteaker Springs Road and Dale Lane (L.M. 6.94) and extending to Bear Creek Road (L.M. 9.01). Project Length - 2.070 miles
CNM200 078 25 0 PUTNAM
The resurfacing (thin mix overlay) on S.R 290 beginning at Shipley Road (L.M. 1.58) and extending to west of North Franklin Avenue (L.M. 5.79). Project Length - 4.210 miles
CNM199 079 17 0 RHEA
The resurfacing on S.R 30 beginning at the Bledsoe County line (L.M. 0.00) and extending to east of Morgan Creek Road (L.M. 4.46). Project Length - 4.460 miles
CNM235 080 32 0 ROANE
HSIP-72(13), 73016-3217-94, 73016-4217-04 The resurfacing (thin mix overlay) on S.R. 72 beginning at the Loudon County line (L.M. 0.00) and extending to S.R. 58 (L.M. 7.62). Project Length - 7.620 miles STP-SIP-72(12), 73016-3218-94 The miscellaneous safe...
CNM169 081 40 1 RUTHERFORD
The repair of the bridge on Rocky Fork Road over I-24 (L.M. 1.80). Project Length - 0.1918 mile
CNM181 082 11 0 RUTHERFORD
The repair of the bridge on Epps Mill Road over I-24 (L.M. 25.73). Project Length - 0.000 mile
CNM190 083 31 RUTHERFORD, CANNON
HRRR/HSIP-99(37), 75013-3248-94 The miscellaneous safety improvements at the intersection of S.R. 99 with Jackson Ridge Road and S.R. 269 (L.M. 7.74). Project Length - 0.000 mile HRRR/HSIP-99(38), 75013-3249-94, 08018-3207-94 The miscellaneous safety impr...
CNM196 084 47 0 SCOTT
The improvement of the intersection on U.S. 27 (S.R. 29) at S.R. 63 (L.M. 11.53), including grading, drainage, and paving. Project Length - 0.081 mile
CNM131 085 24 0 SHELBY
The resurfacing and miscellaneous safety improvements on Rust Road, Woodstock-Cuba Road and Locke-Cuba Road beginning north of Fite Road (L.M. 0.13) and extending to Bluff Road (L.M. 6.57). Project Length - 6.440 miles
CNM173 086 44 3 SHELBY
The miscellaneous safety improvements on U.S. 51S (S.R. 3) at the intersection with Harbert Avenue in Memphis. Project Length - 0.112 mile
CNM171 087 17 1 SHELBY
The repair of the bridge on I-40 westbound over the Wolf River (L.M. 5.01). Project Length - 0.000 mile
CNM172 088 29 1 SHELBY
The repair of the bridge on I-40 eastbound over U.S. 70 (S.R. 1, Summer Avenue) (L.M. 13.88). Project Length - 1.767 miles
CNM179 089 268 1 SULLIVAN
The grading, drainage, construction of a concrete Bulb-Tee beam bridge, and paving on U.S. 11E (S.R. 34) at the U.S. 19E (S.R. 37) interchange. Project Length - 1.767 miles
CNM236 090 27 0 TIPTON
The miscellaneous safety improvements on S.R. 384 at the intersections of Robert Johnson Road/Sunnyside Road. Project Length - 0.130 mile
CNM178 091 36 0 TROUSDALE
The repair of the bridge on S.R. 141 over the Cumberland River (L.M. 6.24). Project Length - 0.265 mile
CNM233 092 15 0 UNICOI
The resurfacing (thin mix overlay) on S.R. 173 beginning west of I-26 (L.M. 0.00) and extending to the Carter County line (L.M. 3.24). Project Length - 3.240 miles
CNM230 093 25 0 WASHINGTON
The resurfacing (thin mix overlay) on S.R. 354 beginning at U.S. 11E/321 (S.R. 34) (L.M. 0.00) and extending to Pinnacle Drive (L.M. 5.93). Project Length - 5.930 miles
CNM231 094 13 0 WASHINGTON
The resurfacing on S.R. 400 beginning at Broadway Street (L.M. 1.61) and extending to the Carter County line (L.M. 5.27). Project Length - 3.660 miles
CNM212 095 28 1 WHITE
The resurfacing on S.R. 111 beginning north of Walker Cove Road (L.M. 9.93) and extending to south of Overpass Road (L.M. 13.52). Project Length - 2.715 miles
CNM191 096 26 0 WILLIAMSON
The resurfacing on U.S. 431 (S.R. 106) beginning at Les Watkins Road (L.M. 5.86) and extending to S.R. 397 (Mack Hatcher Parkway) (L.M. 12.48) (excludes Goose Creek Bypass/Lewisburg Avenue intersection). Project Length - 6.320 miles
CNM192 097 24 0 WILSON
The resurfacing on S.R. 171 beginning at the Davidson County line (L.M. 0.00) and extending to north of S.R. 265 (L.M. 3.90). Project Length - 3.868 miles