CNQ926
|
001 |
PHSIP-I-275-3(134) |
63 |
2 |
KNOX |
The improvement of the interchange on I-275 at the I-640 eastbound ramp (Exit 3). |
CNQ211
|
002 |
NA |
28 |
0 |
ANDERSON BLOUNT CAMPBELL CARTER |
The random on-call signing on various Interstates and State Routes. |
CNQ199
|
003 |
N/A |
28 |
0 |
BEDFORD CHEATHAM DAVIDSON DICKSON |
The random on-call signing on various Interstates and State Routes. |
CNQ214
|
004 |
NA |
28 |
0 |
BENTON CARROLL CHESTER CROCKETT |
The random on-call signing on various Interstates and State Routes. |
CNQ207
|
005 |
NA |
28 |
0 |
BLEDSOE BRADLEY CANNON CLAY |
The random on-call signing on various Interstates and State Routes. |
CNQ175
|
006 |
HSIP-146(6) |
24 |
0 |
CANNON DEKALB |
The miscellaneous safety improvements on S.R. 53 from Stones River Road to Tate Road, and on S.R. 146 from the Cannon County line to Game Ridge Road. |
CNQ203
|
007 |
NA |
3 |
0 |
DAVIDSON |
The tunnel cleaning of the Thompson Lane Underpass on S.R. 155. |
CNQ218
|
008 |
NH-I-098-3(27) |
6 |
0 |
DAVIDSON DICKSON ROBERTSON RUTHERFORD |
The annual preventative and unscheduled maintenance on the Nashville Smartway I.T.S. System equipment, including the Transportation Management Center (2016-2018). |
CNQ194
|
009 |
NH/HSIP-7(32) |
35 |
0 |
GILES |
The resurfacing on S.R. 11 from west of South 5th Street to U.S. 31 (S.R. 7) and on U.S. 31 (S.R. 7) from south of College Street to north of Pigeon Roost Road. |
CNQ057
|
010 |
STP-66(52) |
77 |
1 |
HAMBLEN, JEFFERSON |
The paving on S.R. 66 from north of I-81 in Jefferson County to S.R. 160 in Morristown. |
CNQ174
|
011 |
NA |
8 |
0 |
HAMILTON |
The tunnel cleaning of the McCallie Tunnel on U.S.11 (U.S. 64, S.R. 2), the Stringers Ridge Tunnel on U.S. 127 (S.R. 8), and the Bachman Tubes on U.S. 41 (U.S. 76, S.R. 8). |
CNQ020
|
012 |
HSIP-66(49) |
27 |
0 |
JEFFERSON |
Miscellaneous safety improvements including high friction surface treatment on S.R. 66 from S.R. 9 to S.R. 341 and on East Dumplin Valley Road from Talbott-Kansas Road to S.R. 92. |
CNQ201
|
013 |
NA |
5 |
0 |
KNOX |
The tunnel cleaning on the Henley Street Connector Tunnel on S.R. 1 and the SMARTFIX tunnel on S.R. 158 (James White Parkway). |
CNQ139
|
014 |
HSIP-3(141) |
90 |
1 |
LAUDERDALE |
The resurfacing on U.S. 51 (S.R. 3) from near S.R. 19 (Lake Drive) to near Wilson Road, and improvement of the intersection on U.S. 51 (S.R. 3) at Industrial Drive in Ripley. |
CNQ006
|
015 |
HSIP/PHSIP-6(99) |
40 |
0 |
LAWRENCE |
Miscellaneous safety improvements on S.R. 6 at the intersections of East Gaines Street and also S.R. 15, including improvements on S.R. 98 and on Old Florence-Pulaski Road. |
CNQ180
|
016 |
NH/HSIP-15(193) |
28 |
0 |
LAWRENCE |
The resurfacing on U.S. 64 (S.R. 15) from west of David Crockett Elementary School (L.M. 12.64) to east of Columbia Avenue (L.M. 16.02). |
CNQ171
|
017 |
STP/HSIP-242(157) |
17 |
0 |
LAWRENCE |
The resurfacing on S.R. 242 from south of Hudson Road (L.M. 28.20) to S.R. 240 (L.M. 34.20). |
CNQ170
|
018 |
NH/HSIP-20(66) |
17 |
0 |
LEWIS |
The resurfacing on U.S. 412 (S.R. 20) from the Perry County line (L.M. 0.00) to West Linden Avenue (L.M. 5.67). |
CNQ196
|
019 |
NH/HSIP-186(17) |
35 |
1 |
MADISON |
The resurfacing on S.R. 186 from Carriage House Drive (L.M. 3.09) to Channing Way (L.M. 4.44), including I-40 and Vann Drive ramps and bridge deck repair. |
CNQ181
|
020 |
NH/HSIP-15(195) |
40 |
1 |
MCNAIRY |
The resurfacing on U.S. 64 (S.R. 15) from the end of the 4 lane section to the Hardin County line, and on S.R. 117 from S.R. 142 to U.S. 64 (S.R. 15). |
CNQ132
|
021 |
NH/HSIP-215(10) |
27 |
0 |
OBION |
The resurfacing on U.S. 45E (S.R. 215) from U.S. 45E (S.R. 43) (L.M. 0.00) to the Kentucky State line (L.M. 2.07), including bridge deck repair. |
CNQ208
|
022 |
NH/HSIP-3(137) |
31 |
0 |
OBION |
The resurfacing on U.S. 51 (S.R. 3) from Walker Tanner Road (L.M. 16.02) to S.R. 431 (L.M. 17.83). |
CNQ167
|
023 |
NH/HSIP-20(65) |
19 |
0 |
PERRY |
The resurfacing on U.S. 412 (S.R. 20) from the Buffalo River (L.M. 12.90) to east of Jackson Cemetery Road (L.M. 19.00). |
CNQ164
|
025 |
STP/HSIP-65(19) |
16 |
0 |
ROBERTSON |
The resurfacing on U.S. 431 (S.R. 65) from north of U.S. 41 (S.R. 11) (L.M. 7.70) to Brick School Road (L.M. 14.49). |
CNQ159
|
026 |
STP/HSIP-346(10) |
20 |
1 |
SULLIVAN |
The resurfacing on S.R. 346 from the Hawkins County line (L.M. 0.00) to S.R. 36 (L.M. 1.92). |
CNQ172
|
027 |
HPP/NH-109(14) |
344 |
3 |
SUMNER |
The grading, drainage, construction of retaining walls and paving on S.R. 109 from Odom?s Bend Road to the S.R. 109 Bypass south of Gallatin. |
CNQ168
|
028 |
HSIP-258(13) |
28 |
1 |
SUMNER |
The resurfacing on S.R. 258 from New Hope Road (L.M. 8.10) to the Robertson County line (L.M. 13.54). |
CNQ160
|
029 |
STP-NH/HSIP-34(107) |
27 |
0 |
WASHINGTON |
The resurfacing on U.S. 321 (U.S. 11E, S.R. 34) from the Greene County line (L.M. 0.00) to south of Persimmon Ridge Road (L.M. 9.05), including bridge deck repair. |
CNQ178
|
030 |
STP/HSIP-114(15) |
28 |
1 |
WAYNE |
The resurfacing on S.R. 114 from U.S. 64 (S.R. 15) (L.M. 0.00) to the Hardin County line (L.M. 7.89). |
CNQ136 |
031 |
|
This proposal has been withdrawn |
|
|
|
CNQ136 Has been withdrawn from this letting
|
CNQ183
|
031 |
STP/HSIP-124(9) |
19 |
0 |
WEAKLEY |
The resurfacing on S.R. 124 from Staffords Store Road (L.M. 6.36) to the Carroll County line (L.M. 15.77). |
CNQ213
|
032 |
NH/HSIP-166(12) |
297 |
3 |
MAURY |
The construction of a new interchange including a concrete Bulb-Tee beam bridge and paving with Portland cement concrete on S.R. 166 at U.S. 43 (S.R. 6) in Mount Pleasant. |