Questions for Proposal 20211109009

Header information table
Letting ID: 20211109 Call Order: 009
Questions for this proposal
Subject Number Asked Answered
(46 Questions)
Contractor Data Package - It appears this existing surface is damaged File Name: "12290476-Surf-Ex-B... 1 10/11/2021 10:27 AM 10/12/2021 06:47 AM
Abandoning Wells - Is there any information available for the depth of the wells that are to be aban... 2 10/13/2021 08:43 AM 10/18/2021 09:40 AM
Non-mandatory pre-bid meeting - Can you post the slide show and QA notes? 3 10/13/2021 10:32 AM 10/13/2021 10:40 AM
Pipe Underdrain 6” - For items #442 (pipe underdrain 6”), #444 (pipe underdrain unperforated 6”) & #... 4 10/13/2021 03:59 PM 10/18/2021 09:44 AM
Abandoning Sewer & Backfill Controlled Low Strength Items - - On page 1102 of the miscellaneous quan... 5 10/13/2021 04:02 PM 10/18/2021 01:35 PM
Electronic Miscellaneous Quantities - Can the DOT please provide electronic files for the miscellane... 6 10/14/2021 10:50 AM 10/19/2021 07:55 AM
21. Hauling Restrictions - Please remove this Article. The contractor can't bid this project withou... 7 10/14/2021 03:09 PM 10/19/2021 10:10 AM
32. Material and Equipment Staging - Please remove this Article. The contractor can't bid this proje... 8 10/14/2021 03:15 PM 10/19/2021 10:12 AM
Railing Panel Length/Post Spacing - In regards to the Railing Pipe, the standard detail is to provid... 9 10/14/2021 03:27 PM 10/19/2021 10:43 AM
12290476-Surf-Ex-Bonniewell-to-STH-60.xml - 12290476-Surf-Ex-Bonniewell-to-STH-60.xml is corrupted a... 10 10/15/2021 09:57 AM 10/19/2021 07:48 AM
Precast Trench Drain / Temporary Precast Trench Drain - Can a construction detail(s) be provided for... 11 10/15/2021 11:58 AM 10/19/2021 08:01 AM
Removing Draintile and Removing Underdrain - These two items add up to 85,000 LF of quantity, all of... 12 10/15/2021 01:25 PM 10/19/2021 12:29 PM
Concrete Barrier Wall Questions - Questions associated with barrier wall construction and end anchor... 13 10/17/2021 12:40 PM 10/22/2021 09:50 AM
Geotechnical Reports - Please provide the geotechnical reports for the available segments. The spec... 14 10/18/2021 11:16 AM 10/19/2021 10:18 AM
UPRR Railroad Crossing - A.5 Temporary Grade Crossing: The specials state the department has made a... 15 10/18/2021 11:27 AM 10/21/2021 01:53 PM
404 Permit - Please provide a link to obtain a copy of the 404 Permit. 16 10/18/2021 11:31 AM 10/19/2021 10:37 AM
Noise wall painting - Note on plan sheet 1812 states "Note: it is not the Department's intension [si... 17 10/18/2021 12:02 PM 10/21/2021 07:10 AM
Stage 1 inside pavement widening - Should the temporary inside/median typical section drawing on pla... 18 10/18/2021 01:47 PM 10/22/2021 07:32 AM
MSE Wall Copings - Structures R-45-14 and R-45-19 have a note that states the concrete coping quanti... 19 10/18/2021 04:14 PM 10/22/2021 09:52 AM
Special Field Office Bid Item - We are requesting that the DOT eliminate the item for Field Office S... 20 10/19/2021 09:23 AM 10/26/2021 09:22 AM
Temporary Drainage Manholes and Inlets - Per the temporary drainage plans there are many manholes an... 21 10/19/2021 09:47 AM 10/22/2021 09:54 AM
Question to Answer to above: 32. Material and Equipment Staging - How can the contractor bid this, g... 22 10/19/2021 02:06 PM 10/26/2021 09:41 AM
EBS in Median - It appears the Earthwork Summary doesn’t have any EBS quantity in Stage 2 to account... 23 10/19/2021 02:43 PM 10/22/2021 09:55 AM
Stage 1A & 1B - Earthwork Summary - Can the Earthwork Summary for Stage 1 be split into Stage 1A and... 24 10/19/2021 02:47 PM 10/22/2021 07:37 AM
North & South Crossovers Earthwork - It appears the North & South Crossovers are not in the Earthwor... 25 10/19/2021 02:59 PM 10/22/2021 07:30 AM
QMP Subgrade vs Night Work - QMP Subgrade doesn’t work at night. Stage 1 and Stage 2 must be done a... 26 10/19/2021 03:42 PM 11/02/2021 08:46 AM
Miscellaneous Quantity Clarification - Removing Pavement table on plan page 1097 indicates "STAGE 4/... 27 10/20/2021 02:08 PM 10/22/2021 07:39 AM
QMP Base Aggregate Dense 1 1/4-Inch Compaction - I thought this item (QMP Base Aggregate Dense 1 1/4... 28 10/21/2021 03:13 PM 10/25/2021 07:15 AM
Work in the Median - For the work in the median where there is only barrier wall on one side (NB Lan... 29 10/21/2021 03:45 PM 10/28/2021 07:04 AM
Plan Sheet 73 - Fabric vertically between MSE Backfill and Embankment - Why is there Fabric Type DF ... 30 10/21/2021 04:43 PM 10/29/2021 06:51 AM
Cold Patch - Please reduce the current quantity (1,000 tons) to a realistic quantity. The current qu... 31 10/22/2021 04:04 PM 10/26/2021 09:45 AM
R-45-14 & 19 External Stability - For the 2 walls referenced above, note 3 below the "Wall External ... 32 10/25/2021 04:25 PM 11/02/2021 10:38 AM
Bridge Operations - Full Freeway Closure Restrictions - As stated in the Special Provisions, based o... 33 10/26/2021 10:06 AM 10/27/2021 07:26 AM
Structure S-45-0225 - Can you verify if we have to design the structure to 150 square feet sign, or... 34 10/28/2021 11:06 AM 10/29/2021 06:54 AM
New Cable Barrier Items - The current listing of approved cable barrier systems by county does not s... 35 10/28/2021 01:12 PM 11/04/2021 07:29 AM
643.1205.S Basic Traffic Queue Warning System - Is the intent of the Queue Warning System to be used... 36 11/01/2021 03:50 PM 11/03/2021 08:16 AM
SPV.0045.1001 Truck Entering Warning System - Approximately how many of these systems will be requir... 37 11/01/2021 03:59 PM 11/03/2021 08:17 AM
SPV.0045.1002 Combination Work Zone Speed Trailer - Approximately how many of these trailers will be... 38 11/01/2021 04:00 PM 11/03/2021 08:18 AM
0040 204.0109.S Removing Concrete Surface Partial Depth - It appears this Item of 0040 204.0109.S Re... 39 11/02/2021 10:09 AM 11/04/2021 07:30 AM
Compost - Where exactly is the compost to be placed and for what purpose? From the detail in the pla... 40 11/02/2021 10:53 AM 11/04/2021 07:31 AM
Temporary Precast Trench Drain - The only spot it shows in the plan where it goes is in the temporar... 41 11/02/2021 02:18 PM 11/04/2021 03:17 PM
Backfill Controlled Low Strength - Why is there 700 CY of backfill controlled low strength in the em... 42 11/03/2021 10:33 AM 11/05/2021 07:42 AM
Anchored Temp Barrier - Can more info be provided on location of the anchored temp barrier bid quant... 43 11/04/2021 12:03 PM 11/05/2021 10:08 AM
628.2023 Erosion Mat II B - This type of erosion mat has been used very sparingly in the last severa... 44 11/04/2021 02:03 PM 11/05/2021 08:16 AM
SPV Article 20 - UPRR Company Requirements - Section E. of the subject SPV Article 20 indicates that... 45 11/04/2021 03:33 PM 11/09/2021 06:53 AM
Article 81 - Backfill Slurry - Article 81 Backfill Slurry appears to indicate all storm sewer pipe a... 46 11/04/2021 04:25 PM 11/05/2021 10:11 AM

Error

Bid Express: New Roads

Bid Express: New Roads is a series of updates aimed at creating a more personalized experience that better caters to individual needs, jobs, and responsibilities.

Over the coming months, we'll be rolling out redesigned experiences to you across the entire service. Learn more.

Don't worry, if you don't love it, you can switch back to classic Bid Express for a limited time while you get used to the new look.

No thanks