Exhibit 2 Existing Plans - The Exhibit 2 PDF will not open. It says the file is damaged. 1 02/01/2021 08:01 AM 02/01/2021 01:01 PM
Access to the existing bridge inspection reports - Can the existing bridge inspection reports be pos... 2 02/10/2021 01:47 PM 02/22/2021 08:07 AM
New Bearing Heights - We have found some discrepancies between the bearing heights shown on the new ... 3 02/10/2021 01:50 PM 02/12/2021 11:39 AM
New Bearing Heights - We have found some discrepancies between the bearing heights shown on the new ... 4 02/10/2021 01:50 PM 02/12/2021 11:39 AM
New Bearing heights - clarified dimensions for the EB Pier 6B & Ramp A P2 . We have found some ... 5 02/10/2021 01:53 PM 02/12/2021 11:40 AM
Item 601030-000 Patching Concrete Structures - Sheet 2/140 states that Modified Class B concrete sha... 6 02/12/2021 10:05 AM 03/05/2021 10:09 AM
Fabricated Structural Steel - What is included in the item Fabricated Structural Steel? 7 02/15/2021 03:07 PM 03/02/2021 09:28 AM
Repairs RB-A & RB-B on Sheet 5/140 - Debris removal - "Repairs RB-A and RB-B on sheet 5/140 discuss ... 8 02/18/2021 10:28 AM 03/02/2021 09:28 AM
"Repairs RB-A and RB-B on sheet 5/140 surface prep for for paint 9 02/18/2021 10:29 AM 03/02/2021 09:29 AM
"Repairs RB-A and RB-B on sheet 5/140 Surface prep for paint limits - "Repairs RB-A and RB-B on shee... 10 02/18/2021 10:31 AM 03/02/2021 09:29 AM
"Repairs RB-A and RB-B on sheet 5/140 Note 5 - Repairs RB-A and RB-B on sheet 5/140 discuss removin... 11 02/18/2021 10:32 AM 03/02/2021 09:29 AM
Repairs RB-A and RB-B on sheet 5/140 Surface prep per spec 688 or spec 685 - "Repairs RB-A and RB-B ... 12 02/18/2021 10:33 AM 03/02/2021 09:29 AM
Overlay Thickness Clarification - Plan Sheet 4/140 calls out to follow Standard Spec 679 which would... 13 02/22/2021 11:55 AM 03/02/2021 09:30 AM
Field office Bid item Quantity needs to be revised to match the proposal completion date - The bid q... 14 02/23/2021 02:06 PM 03/05/2021 07:39 AM
Bearing keeper assemblies - Do all 64 disc bearings require keeper plate assemblies? 15 02/25/2021 08:16 AM 03/02/2021 04:34 PM
Existing plans for the WV Approach Bridge - The existing drawings posted as exhibit #2 do not have t... 16 02/26/2021 04:53 PM 03/02/2021 09:30 AM
TCP Phases 2 & 3 - During Phase 2 & 3, the TCP plans show long runs of temporary barrier installed a... 17 03/02/2021 08:47 AM 03/02/2021 04:35 PM
Resetting Temporary Barrier - There is only 638 LF of Remove and Resetting of Temporary Barrier. How... 18 03/02/2021 10:33 AM 03/05/2021 07:40 AM
Temporary Impact Attenuators - It appears temporary impact attenuators will be needed to protect tem... 19 03/02/2021 12:10 PM 03/02/2021 04:36 PM
Expansion Joint Repair Details - On Sheet 9 of 140, what is the table in the bottom right referring ... 20 03/02/2021 02:14 PM 03/04/2021 04:28 PM
Utility Removal Detail - How is the Utility Removal Detail work on Sheet 140 of 140 paid? 21 03/02/2021 03:19 PM 03/04/2021 04:33 PM
Keeper Plates - We are very concerned about the “mill to bear” requirement for fit up of the forked ... 22 03/02/2021 04:17 PM 03/04/2021 04:33 PM
Keeper Plates for Non-Guided Expansion Bearings - Eastbound, Pier 6, Girder 6/Girder 5 are non-guide... 23 03/03/2021 09:33 AM 03/05/2021 07:41 AM
Need Truss portion of the bridge plans - The existing drawings posted as exhibit #2 do not have the ... 24 03/03/2021 12:15 PM 03/03/2021 05:42 PM
Existing 1/2" bolts on the truss being replaced with 3/4" bolts - Regarding repair type RB-A: The e... 25 03/03/2021 04:37 PM 03/04/2021 04:45 PM
Increasing bolt sizes - Regarding repair type RB-A: The existing truss drawings received with Amend... 26 03/03/2021 04:49 PM 03/04/2021 04:46 PM
Zone Painting - The limits of Zone Painting are not defined in the plans, please clarify the extent ... 27 03/04/2021 10:32 AM 03/04/2021 05:01 PM
Concrete Protective Coating - In Addenda #2 on DWG #3, section for "Concrete Protective Coatings" th... 28 03/04/2021 10:34 AM 03/05/2021 07:33 AM
Zone Painting - Does the existing steel bridge contain lead based paint? 29 03/04/2021 10:35 AM 03/05/2021 07:34 AM
Zone Painting - What containment classification and monitoring methods are required for the surface ... 30 03/04/2021 10:36 AM 03/04/2021 05:00 PM
Bridge Cleaning - What containment classification is required for Bridge Cleaning (Pressure washing)... 31 03/04/2021 10:39 AM 03/04/2021 04:46 PM
Addenda #2 - Given the changes in the last minute addenda, can this proposal be postponed? Subcontra... 32 03/04/2021 10:41 AM 03/05/2021 07:34 AM
Bridge Cleaning - Please Clarify the limits for Bridge Cleaning "Washing" all structural steel. Does... 33 03/05/2021 11:00 AM 03/05/2021 04:13 PM
Request to Postpone the Bid - Would you consider postponing this bid to a later date? Due to the add... 34 03/05/2021 11:04 AM 03/05/2021 04:17 PM
Follow Up on Question 33 Bridge Cleaning "Washing" - Washing of the Steel in the Truss Span, also in... 35 03/08/2021 01:27 PM 03/08/2021 08:50 PM

Error

Bid Express: New Roads

Bid Express: New Roads is a series of updates aimed at creating a more personalized experience that better caters to individual needs, jobs, and responsibilities.

Over the coming months, we'll be rolling out redesigned experiences to you across the entire service. Learn more.

Don't worry, if you don't love it, you can switch back to classic Bid Express for a limited time while you get used to the new look.

No thanks