Bid date - Due to the large amount drawings involved and the required takeoff and estimating, we wou... 1 06/14/2019 10:32 AM 06/17/2019 09:11 AM
Plans - When will plans be available on Bid Express or how do we obtain them? 2 06/14/2019 11:02 AM 06/17/2019 09:10 AM
Plan Sheets Labeled 'For Information Only' - Numerous plan sheets throughout the bid set are listed ... 3 06/17/2019 10:08 AM 06/17/2019 05:38 PM
Bid Opening Time - There are conflicting bid times in the proposal. Please advise what time the bid ... 4 06/17/2019 12:39 PM 06/17/2019 05:39 PM
Missing Plan Sheets - There appear to be several plan sheets missing and duplicate page numbers. Ple... 5 06/18/2019 08:04 AM 06/19/2019 08:41 AM
Bid Date Extension - In follow up to question 1, we also request a bid date time extension due to si... 6 06/19/2019 11:28 AM 06/21/2019 08:41 AM
Bid Date Extension Request - After contacting several major subcontractors and suppliers that are ne... 7 06/20/2019 08:55 AM 06/21/2019 08:43 AM
404/401 Permit - The current 404/401 Permit indicates there is minimal painting required on the I-70... 8 06/20/2019 03:18 PM 06/25/2019 06:42 AM
Fulton Bridge - When will "For Construction" drawings be available for Fulton Bridge? 9 06/21/2019 09:18 AM 06/25/2019 06:43 AM
Railroad - There are references in the WLE Railroad Agreement referring to Design-Build Contractors ... 10 06/21/2019 03:14 PM 06/25/2019 07:03 AM
Railroad - There are references in the NS Railroad Agreement referring to Design-Build Contractors. ... 11 06/21/2019 03:14 PM 06/25/2019 07:03 AM
Sign & Marking Plans - Sign and Marking Plan shows the entire length of the job striped with new pav... 12 06/21/2019 03:15 PM 06/25/2019 07:04 AM
TTCP Plans - Multiple TTCP Plans are For Information Only, including traffic Phase 3 and 4 and the E... 13 06/21/2019 03:16 PM 06/25/2019 07:04 AM
Roadside Assistance - Section 636.2 references 1-ton truck dual real requirements with a boom capaci... 14 06/21/2019 03:16 PM 06/25/2019 07:04 AM
Roadside Assistance - 636.6.3 States that "the roadside assistance vehicle shall patrol the entire p... 15 06/21/2019 03:17 PM 06/25/2019 07:04 AM
Roadside Assistance - 636.6.3 states that the roadside assistance vehicle shall be furnished by the ... 16 06/21/2019 03:17 PM 06/25/2019 07:05 AM
TTCP-2 - TTCP-2, Note #25.A states that the project and active detours shall be driven continuously ... 17 06/21/2019 03:20 PM 06/25/2019 07:05 AM
TTCP-2 - TTCP-2, Note #25.B states that the roadside assistance vehicle "shall be equipped to addres... 18 06/21/2019 03:20 PM 06/25/2019 07:05 AM
TTCP-2 - TTCP-2, Note 25A and 25C state that providing "on-call" or stationary tow services shall no... 19 06/21/2019 03:21 PM 06/25/2019 07:06 AM
TTCP - When will a full design be provided on cross overs project wide? 20 06/21/2019 03:22 PM 06/25/2019 07:06 AM
Painting - Bridge notes throughout the plans say "Existing top flanges of structural steel…shall und... 21 06/21/2019 03:37 PM 06/25/2019 07:06 AM
TTCP-7 - Traffic phase switches in Segment A (Ohio River Bridges) will require night time lane closu... 22 06/21/2019 03:38 PM 06/25/2019 07:07 AM
TTCP-2 - Traffic phase lane restrictions in Segment A and B (Ohio River Bridges and west-of-I-470 sp... 23 06/21/2019 03:39 PM 06/25/2019 07:07 AM
TTCP-2 - In TTCP-2, for bid item 636017-005 Temp Barrier TL-3, 1, requires the use of TL-3 barrier a... 24 06/21/2019 03:39 PM 06/25/2019 07:08 AM
Temp Barrier - TTCP-2 - TL-3, Type I barrier is required throughout this project. It is our underst... 25 06/21/2019 03:40 PM 06/25/2019 07:08 AM
Temp Barrier - TTCP-2 - TL-3, Type I barrier is required throughout this project. It is our underst... 26 06/21/2019 03:41 PM 06/25/2019 07:08 AM
Temp Barrier - TTCP-2 - TL-3, Type I barrier is required throughout this project. It is our underst... 27 06/21/2019 03:42 PM 06/25/2019 07:09 AM
Temp Barrier - TTCP-2 - TL-3, Type I barrier is required throughout this project. It is our underst... 28 06/21/2019 03:43 PM 06/25/2019 07:09 AM
Top Flanges - Please clarify spec for the surface prep and painting of the exposed Top Flanges. Is i... 29 06/21/2019 04:30 PM 06/25/2019 07:09 AM
Fort Henry Bridge Plans - I was not able to open the Plans for the For Henry Bridge, kept getting a ... 30 06/21/2019 04:33 PM 06/25/2019 07:11 AM
Mass Concrete vs. Schedule - Per the Proposal, concrete placements with a least dimension greater th... 31 06/24/2019 09:08 PM 06/27/2019 07:07 AM
Lightweight Deck Concrete - The General Notes on Sheet G11 of the First Bridge East of Tunnel state ... 32 06/24/2019 10:12 PM 06/27/2019 07:06 AM
Pre-Bid - The sign posted to the door for the 6/25 meeting says the new mandatory prebid meeting sta... 33 06/26/2019 10:34 AM 06/27/2019 07:09 AM
BR 2034.2 Line 1195 Repair S3 - Will the Department please provide information which of the repairs ... 34 06/26/2019 02:11 PM 07/02/2019 09:12 AM
B2034.2 Line 1200 Repair S5 - Would the Department please clarify what the unit Each represents and ... 35 06/26/2019 03:39 PM 07/02/2019 09:11 AM
Deck Placement Sequence - Note 4 on Sheet G160 of the First Bridge East of Tunnel plans states that ... 36 06/27/2019 08:28 AM 07/03/2019 08:26 AM
S2 Repair - Bridge 2034.2, Sheet B110 of B200, please clarify the work included in repair S2. 4 loc... 37 06/27/2019 10:53 AM 07/02/2019 09:12 AM
Web Repair - Bridge 2034.2, Sheet B110 of B200: is the web repair plate 9/16" or 3/8" as shown in D... 38 06/27/2019 10:54 AM 07/02/2019 09:13 AM
S3 Repair - Bridge 2034.2, Sheet B111 of B200: Please clarify the work included in Repair S3. Is t... 39 06/27/2019 10:55 AM 07/02/2019 09:13 AM
Weld Detail - Bridge 2034.2, Sheet B111 of B200: What is the weld detail for the 2" stiffener repai... 40 06/27/2019 10:56 AM 07/02/2019 09:14 AM
Weld Detail - Bridge 2034.2, Sheet B111 of B200: What size weld is required for the web repair plat... 41 06/27/2019 10:57 AM 07/02/2019 09:14 AM
S3 Weight - Bridge 2034.2, Sheet B111 of B200: What is the estimated weight for the S3 repair shown... 42 06/27/2019 10:58 AM 07/03/2019 08:27 AM
Corroded Area Limits - Bridge 2034.2, Sheet B111 of B200: Note 3 says to cut out the corroded area?... 43 06/27/2019 10:58 AM 07/02/2019 09:17 AM
S3 Quantity - Bridge 2034.2, Sheet B112 of B200: The S3 repair detail on this sheet is not quantifi... 44 06/27/2019 10:59 AM 07/10/2019 01:55 PM
S3A Info - Bridge 2034.2, Sheet B113 and B114 of B200: Repair S3A is not called for on the bid sche... 45 06/27/2019 11:00 AM 07/10/2019 01:54 PM
S3A Quantity - Bridge 2034.2, Sheets B113 and B114 of B200: Please clarify what is included in an ... 46 06/27/2019 11:01 AM 07/02/2019 11:59 AM
Steel Repair - Bridge 2034.2, Sheets B115 to B122 of B200: These details are for 41 each repairs. ... 47 06/27/2019 11:02 AM 07/02/2019 11:54 AM
SS Repair - Bridge 2034.2, Sheets B115 to B122 of B200: Are the bolts and pack rust called for on t... 48 06/27/2019 11:03 AM 07/02/2019 11:52 AM
Weld Detail - Bridge 2034.2, Sheet B121: What is the weld size for this repair? 49 06/27/2019 11:03 AM 07/02/2019 11:59 AM
Web Repair - Bridge 2034.2, Sheet B122: Is this "Web Repair" detail synonymous with the top and bot... 50 06/27/2019 11:04 AM 07/03/2019 08:29 AM
Stiffener - Bridge 2034.2, Sheet B122: Is the stiffener replaced for the web repair incidental to t... 51 06/27/2019 11:04 AM 07/03/2019 09:14 AM
Weld Detail - Bridge 2034.2, Sheet B122: What is the weld size for section A-A? 52 06/27/2019 11:05 AM 07/03/2019 09:14 AM
S7A - Bridge B2034.2, Sheet B123 and B124 of B200: Sheets details repair S7A. Please add pay item ... 53 06/27/2019 11:06 AM 07/03/2019 09:18 AM
S7B - Bridge B2034.2, Sheet B125 of B200: Sheet details repair S7B. Please add pay item for these ... 54 06/27/2019 11:07 AM 07/03/2019 09:17 AM
Clean and Prime Limits - Bridge B2034.2, Sheet B131 of B200: Procedure note 2 states to clean and p... 55 06/27/2019 11:08 AM 07/10/2019 01:54 PM
S5 Repair - Bridge 2034.2, Sheets 121 and 122: Please define locations of these S5 repairs, i.e. Sp... 56 06/27/2019 11:08 AM 07/03/2019 03:41 PM
Bridge 2034.2 - Brdige 2034.2, Sheet B123: In the section in the top left of the page, is the beari... 57 06/27/2019 03:13 PM 07/03/2019 03:40 PM
Bridge 2034.2 Line 1185 Repair B4 - Bridge 2034.2, Sheet B96: There is a note within Detail A that ... 58 06/27/2019 03:14 PM 07/03/2019 03:39 PM
Bridge 2034.2 - What is bid item 1135, Fabricated Structural Steel - 63,103 lbs? Isn't the steel re... 59 06/27/2019 03:15 PM 07/03/2019 03:38 PM
Bridge 2034.2 Line 1200 Repair S5 - Bridge 2034.2, Sheets 121 & 122: Please define the field weld si... 60 06/27/2019 03:16 PM 07/03/2019 03:36 PM
Repair B4 - All bridges - Repair B4: Is it the intent of the department to have all these bearings ... 61 06/27/2019 03:17 PM 07/10/2019 01:54 PM
Bridge 2034.2 - Bridge 2034.2, Sheet 541: States no work below OHW until approved 404 permit is obta... 62 06/27/2019 03:17 PM 07/10/2019 01:53 PM
Bridge 2034.2 - Bridge 2034.2, Sheet 541: States "The contractor is responsible for verifying the ad... 63 06/27/2019 03:19 PM 07/10/2019 01:52 PM
Jacking Beams - Where is the fabrication, installation, and removal of the W33x130 jacking beam to b... 64 06/27/2019 03:19 PM 07/10/2019 01:52 PM
Semi-Integral Rebar - Where are the 2-1/2" holes in the ends of the girders for the semi integral ab... 65 06/27/2019 03:20 PM 07/10/2019 01:51 PM
Tack Welds - Ref 3875 Repair S19 is for removing tack welds at the integral steel pier caps on the E... 66 06/27/2019 03:20 PM 07/03/2019 03:35 PM
Middle Creek Bridge - The Middle Creek Bridge plans call out that holes shall be drilled for the sem... 67 06/27/2019 03:39 PM 07/10/2019 01:51 PM
Middle Creek Bridge - The Middle Creek bearing plans call out the weld between the HP14x73 pedestals... 68 06/27/2019 03:39 PM 07/08/2019 10:48 AM
Middle Creek Bridge - What, if any, type of coating is required on the MC18x42.7 diaphragms being in... 69 06/27/2019 03:40 PM 07/08/2019 10:49 AM
Middle Creek Bridge - What are the material and coating requirements structural steel components and... 70 06/27/2019 03:41 PM 07/08/2019 10:50 AM
Elm Grove I/C Bridge - The bearing details on S70 thru S72 for the Elm Grove I/C bridge show anchor ... 71 06/27/2019 03:45 PM 07/08/2019 10:50 AM
Elm Grove I/C Bridge - Plan note 2 on S85 of the Elm Grove I/C plan set states that the contractor i... 72 06/27/2019 03:46 PM 07/08/2019 10:51 AM
Elm Grove I/C Bridge - There are not any existing bearing stiffeners at Abut WB2 on the Elm Grove I/... 73 06/27/2019 03:46 PM 07/08/2019 10:51 AM
Elm Grove I/C Bridge - The weld size between the 1/2" gusset plate and the C12x30 diaphragm member o... 74 06/27/2019 03:47 PM 07/08/2019 10:52 AM
Elm Grove I/C Bridge - Note 4 on Sht S80 referencing the the Elm Grove I/C S10 repair describe repla... 75 06/27/2019 03:48 PM 07/08/2019 10:52 AM
Elm Grove I/C Bridge - Can the Division please advise on what the 297,121 lbs of fabricated structur... 76 06/27/2019 03:48 PM 07/08/2019 10:52 AM
Expanision Joint Warranty - Will the WVDOH consider replacing the 5 year warranty on the expansion j... 77 06/27/2019 03:49 PM 07/15/2019 07:21 AM
Elm Grove I/C Bridge - The drill pattern detail on Sht S25 of the Elm Grove I/C plan set does agree ... 78 06/27/2019 03:56 PM 07/08/2019 10:53 AM
Patching C1C - With the depth not being prescribed, nor having a max depth, would the WVDOH change t... 79 06/28/2019 08:51 AM 07/10/2019 01:46 PM
Back Channel - Sheet 541 states "contractor to determine if column sections underground require repa... 80 06/28/2019 08:54 AM 07/22/2019 07:49 AM
404 Permit - Sheet 541 states "no work below elevation 636.1' until the 404 permit is obtained. Ple... 81 06/28/2019 08:55 AM 07/08/2019 10:53 AM
Back Channel - Sheet 541 states “ contractor is responsible for verifying the adequacy and stability... 82 06/28/2019 08:57 AM 07/10/2019 01:45 PM
Back Channel - Sheet 541, middle column, 5 lines up from bottom, states that "no live traffic on the... 83 06/28/2019 08:59 AM 07/15/2019 07:20 AM
Back Channel - Back Channel Bridge plan sheet 631 states that “the contractor shall report all defic... 84 06/28/2019 09:01 AM 07/10/2019 01:45 PM
Main St Bridge - Main Street Bridge plan sheet 920 states “ contractor to verify the structural adeq... 85 06/28/2019 09:02 AM 07/08/2019 10:54 AM
Ft Henry Bridge - On Sheet C54 of C187 There is a comment located under the Repair C3 for Concrete P... 86 06/28/2019 09:03 AM 07/10/2019 01:46 PM
Clean & Lubricate Bearings - Will the bearings that are called out to be cleaned and lubricated need... 87 06/28/2019 03:42 PM 07/10/2019 01:44 PM
ITEM NO. 688003-001 CONTAINMENT & DISPOSAL OF SPENT MATERIAL, CONCRETE PROTECTIVE COATING - Please c... 88 06/28/2019 03:42 PM 07/08/2019 10:55 AM
Temporary Lighting - On Sheet 87, Item K under Temporary Lighting states "Contractor is responsible ... 89 06/28/2019 04:51 PM 07/08/2019 10:55 AM
Temporary Barrier - On Sheet 162 (among many others) a note is included to protect existing high mas... 90 06/28/2019 04:52 PM 07/08/2019 10:56 AM
Ramp S1 Phase - Ramp S1 is shown in various phases throughout the MOT plans. In the table on sheet ... 91 06/28/2019 04:52 PM 07/10/2019 01:44 PM
Ramp A Closure - Sheet 226 for Phase 1A contains a note which states "This Ramp A Closure shall coun... 92 06/28/2019 04:53 PM 07/08/2019 10:56 AM
Fort Henry Bridge Repair S1 - Please define what the unit each represents. Not able to match 8 each... 93 07/01/2019 02:53 PM 07/11/2019 11:28 AM
Back Channel Pier 7 Pedestals - Plan sheet 615 lists the estimated bearing pedestal top elevations f... 94 07/01/2019 04:39 PM 07/11/2019 11:31 AM
TTCCP Sequence of Construction - TTCCP Sequence of Construction states the Ft Henry Bridge will be c... 95 07/02/2019 11:07 AM 07/10/2019 01:43 PM
Item 6010105-005-FRP WRAP SYSTEM - The specification states either Glass or Carbon fiber to be used ... 96 07/02/2019 12:47 PM 07/11/2019 11:33 AM
Item 6010105-005 FRP Wrap System (Measurement of Payment) - Pay item is listed as Square Foot (meter... 97 07/02/2019 12:50 PM 07/11/2019 11:35 AM
Item 6010105-005 FRP Wrap System (Pier Cap End Detail) - No detail for pier cap end is noted in the ... 98 07/02/2019 12:53 PM 07/11/2019 11:33 AM
FRP Wrap - The plan sheets for BEL-70-2684C bridge show FRP Wrap system with the number of layers an... 99 07/03/2019 02:02 PM 07/11/2019 11:31 AM
Railroad Flagging Costs - The Norfolk Southern and Wheeling & Lake Erie Railroad agreements included... 100 07/03/2019 03:01 PM 07/11/2019 11:27 AM
Light Poles - Sheet 441 states that existing light poles shall be removed, stored, and reerected per... 101 07/03/2019 03:38 PM 07/10/2019 01:43 PM
Temporary Barrier - Sheet 436, under Temporary Barrier, states "Contractor is responsible for the de... 102 07/03/2019 03:38 PM 07/11/2019 11:37 AM
General Bridge Notes - Under the general bridge notes, it says “Do not use form support systems that... 103 07/03/2019 03:39 PM 07/11/2019 11:37 AM
Mag Particle Testing - Sheet 541 of Amendment 1 under Deck Replacement – Removal of Unauthorized Wel... 104 07/03/2019 03:40 PM 07/22/2019 07:54 AM
Reinforcement Bar Schedule - Notes on plan sheets 697,698,700,702 and 2514 say “Reinforcement bar sc... 105 07/03/2019 03:42 PM 07/15/2019 08:08 AM
Incentive/Disincentive - To obtain the incentive the ramp needs to be complete and permanently open ... 106 07/03/2019 03:42 PM 07/10/2019 01:42 PM
Bridge Construction Loading - The bridges have a general note saying “Prior to imposing any constr... 107 07/03/2019 03:43 PM 07/22/2019 07:54 AM
Homeless Encampments Removal / Storage Costs - How is the Contractor to be compensated for work asso... 108 07/05/2019 10:34 AM 07/15/2019 08:08 AM
Agg for Maintaining Traffic - Items 570-585 were unable to be located in the quantity tables, plan s... 109 07/05/2019 10:38 AM 07/15/2019 08:08 AM
Shear Studs - The response to question 59 states repair S17, Stud Shear Connectors, are to be paid u... 110 07/08/2019 12:24 PM 07/15/2019 08:07 AM
Sleeper Slabs - The BEL-70 bridge approach slab appears that it doesn’t have a TYPE A,B, or C Instal... 111 07/08/2019 12:25 PM 07/15/2019 08:07 AM
Special Provisions - The special provisions listed on sheet 437 does not entirely correspond with th... 112 07/08/2019 12:26 PM 07/15/2019 08:07 AM
Approach Slab - Plan sheets 520-522 show a 17” approach slab which is typical in Ohio. The bid item... 113 07/08/2019 12:26 PM 07/15/2019 08:06 AM
Electrical - Note on sheet 437 pertains to Removal and Storage of Materials. This includes light po... 114 07/08/2019 12:27 PM 07/15/2019 08:06 AM
Scuppers - Bridge 2034.2, Sht B151 - B153, and B185 – Sheet B185 shows down spouts running verticall... 115 07/08/2019 12:43 PM 07/15/2019 08:06 AM
Elm Grove Interchange Bridge and Fort Henry Bridge - The note section says the approach slab and sle... 116 07/08/2019 01:15 PM 07/15/2019 08:06 AM
Main Street Bridge - Quantities on dwg. D4 has an item Fabricated Structural Steel of 15,167 lbs. an... 117 07/08/2019 01:19 PM 07/15/2019 08:05 AM
Fulton Bridge - Please clarify that the Caissons at Fulton Bridge do not require mass concrete requi... 118 07/08/2019 01:20 PM 07/15/2019 08:05 AM
ODOT BEL Bridge - Are there existing plans for the ODOT Belmont Bridge that extends from the western... 119 07/08/2019 01:21 PM 07/15/2019 08:05 AM
ODOT BEL Bridge - Can Stay-in-place forms be utilized for the ODOT Structure? 120 07/08/2019 01:22 PM 07/15/2019 08:04 AM
RAMP G---BENT G2-CORNER PILE RETROFIT - Please take the following into consideration: 1. Excavation ... 121 07/08/2019 01:30 PM 07/15/2019 08:03 AM
ODOT BEL - Is the contractor to include all costs associated with flagging operations for both NS an... 122 07/08/2019 01:32 PM 07/11/2019 11:28 AM
Project Funding - Is this a federal or state funded project? Are there federal wages that should be... 123 07/08/2019 01:33 PM 07/16/2019 02:07 PM
Downspouting - Bridge 2034.2 - Notes indicate that "Replacing Downspouting System Will Be Paid Under... 124 07/08/2019 01:39 PM 07/15/2019 08:03 AM
I-70 Fulton Bridges - Structural Steel Quantity - What is the quantity of structural steel for the F... 125 07/08/2019 03:13 PM 07/10/2019 01:41 PM
I-70 Fulton Bridges - Will "For Construction" Design Drawings be made available to bidders for the F... 126 07/08/2019 03:14 PM 07/10/2019 01:41 PM
I-70 Fulton Bridges - Sub- Stringer size? - On Design Sheets 1783 & 1788 in the framing plan view, t... 127 07/08/2019 03:18 PM 07/15/2019 08:03 AM
Spacing - Bridge 2034.2, Sheet B184 – What is the maximum spacing for Details A-E? 128 07/08/2019 04:00 PM 07/15/2019 08:02 AM
Back Channel Bridge - The estimated bridge quantities on Sheet 535 for Back Channel Bridge list 997 ... 129 07/08/2019 04:01 PM 07/15/2019 08:02 AM
BEL-70 Bridge - For Bridge BEL-070, are the median and outside parapets/transitions on the approach ... 130 07/08/2019 04:02 PM 07/15/2019 08:02 AM
Temp Structure for Maint Traffic, Deck Repairs A,B,C (Item 636005-001) - Does this item include labo... 131 07/09/2019 09:22 AM 07/15/2019 08:01 AM
Bridge 2070-7.1 Concrete Protective Coating - The General Notes for Bridge 2070-7.1 indicate the Con... 132 07/09/2019 09:25 AM 07/15/2019 07:45 AM
Bridge 0703095 - Concrete Protective Coating - Sheet A50 indicates that a Concrete Protective Coatin... 133 07/09/2019 09:42 AM 07/15/2019 07:44 AM
Fort Henry - Note #3 on plan sheet 786 of 2612 states “Class B concrete quantity includes approach s... 134 07/09/2019 09:56 AM 07/15/2019 07:44 AM
Anchored PCB - Given that the previous bid exceeded the DOH’s desired budget, which caused a year de... 135 07/09/2019 09:57 AM 07/15/2019 07:42 AM
Bel-70 Bridge - The ODOT BEL-70 bridge has biditems setup in WV format and plan notes discuss meetin... 136 07/09/2019 10:05 AM 07/15/2019 07:41 AM
Bel-70 Bridge - The ODOT BEL-70 bridge has biditems setup in WV format and plan notes discuss meetin... 137 07/09/2019 10:06 AM 07/15/2019 07:41 AM
Back Channel Bridge - Please verify Class H concrete quantity for Unit 4 on the Back Channel Bridge.... 138 07/09/2019 10:48 AM 07/15/2019 07:34 AM
Project Traffic Control - Item 636027? - Is it the intent of WVDOH to generate a bid item 636027* fo... 139 07/09/2019 11:50 AM 07/15/2019 07:33 AM
Bridge 2069-3.2 Expansion Joint - Bridge 2069-3.2 contains a pay Item No. 627025-002. However, F31 ... 140 07/09/2019 01:21 PM 07/15/2019 07:33 AM
Bridge 2029-3.2 ADA Compliant Expansion Joint - Bridge 2069-3.2 Sheet F24 Detail C shows an ADA Comp... 141 07/09/2019 01:28 PM 07/15/2019 07:32 AM
Ft. Henry - Abut 1 Bearing: There is no welding detail provided for the Abut 1 Bearings shown on Sht... 142 07/09/2019 02:31 PM 07/15/2019 07:32 AM
Ft. Henry Bridge - Abut 1 Bearing: There is no welding detail provided for the Abut 1 Bearings shown... 143 07/09/2019 02:59 PM 07/15/2019 07:32 AM
Ft. Henry - Abut 1 Bearing: Note 6 on Sht C62 refers to Section 615.2.3.5, this is not included in t... 144 07/09/2019 02:59 PM 07/15/2019 07:31 AM
Ft. Henry Bridge - C6 Repair: It appears the C6 repairs on C55 are mislabeled. The repair locations ... 145 07/09/2019 03:00 PM 07/15/2019 07:31 AM
Ft. Henry Bridge - Weld Details: There are a number of shop and field welds shown in the Ft Henry Br... 146 07/09/2019 03:01 PM 07/15/2019 07:31 AM
Ft. Henry Bridge - Abut Diaphragm: What size holes are to be drilled through the beam ends at Abut 1... 147 07/09/2019 03:02 PM 07/15/2019 07:30 AM
Fort Henry Bridge - Repair S3: Please provide the dimension for the horizontal leg of the 5/16" repa... 148 07/09/2019 03:02 PM 07/15/2019 07:30 AM
Ft. Henry Bridge - Repair S16: On C84 the Elevation and Plan view of the Case B S16 repair shows 2ea... 149 07/09/2019 03:03 PM 07/15/2019 07:29 AM
Ft. Henry Bridge - Repair S3/S16: The Ft Henry framing plan and repair location drawings show S3 rep... 150 07/09/2019 03:04 PM 07/22/2019 07:49 AM
Ft. Henry Bridge - Repair B7: The notes on C68 for the B7 repair describe removing and replacing ang... 151 07/09/2019 03:05 PM 07/22/2019 07:50 AM
Ft. Henry Bridge - Repair S7: The notes on C98 call out the existing jacking web stiffeners on the C... 152 07/09/2019 03:05 PM 07/15/2019 07:29 AM
Ft. Henry Bridge - Repair S7: Please clarify the number of plugs that are required at Pier 7 for the... 153 07/09/2019 03:06 PM 07/22/2019 07:50 AM
Ft. Henry Bridge - Repair S10: The notes on C100 for the Crack Arrest Repair direct you to the Gener... 154 07/09/2019 03:07 PM 07/22/2019 07:51 AM
Ft. Henry Bridge - Repair S10: Note 2 on C100 states that the liquid penetrant test procedure shall ... 155 07/09/2019 03:31 PM 07/22/2019 07:51 AM
Ft. Henry Bridge - Repair S12: Can the Department please clarify the repairs on C102. What materials... 156 07/09/2019 03:32 PM 07/15/2019 07:26 AM
Ft. Henry Bridge - Repair S3: Is the new W27x84 substringer header beam to be installed only on one ... 157 07/09/2019 03:32 PM 07/15/2019 07:26 AM
Ft. Henry Bridge - Repair S16: There are more S16 repairs called out in the plans than shown on the ... 158 07/09/2019 03:33 PM 07/15/2019 07:25 AM
Bridge No. 2072.3 Downspouting - Plan notes indicate that all repair work for repair type D15 shall ... 159 07/09/2019 03:55 PM 07/15/2019 07:27 AM
Bridge 2074.3 Scuppers - Plan note indicates Replacing Scuppers Will Be Paid Under 615075-002, Misce... 160 07/09/2019 04:22 PM 07/19/2019 08:43 AM
Bridge 2074.3 Downspouting - Plan note indicates Replacing Downspouting System Will Be Paid Under It... 161 07/09/2019 04:25 PM 07/19/2019 08:43 AM
Bridge No. 2077.5 Cross Girder at Piers WB1 / WB2 and EB1 / EB2 - Sheets R97 and R105 show work at C... 162 07/10/2019 09:06 AM 07/19/2019 08:43 AM
Bridge No. 2077.5 Downspouts - Plan notes indicate that Replacing Downspouting System Will Be Paid U... 163 07/10/2019 09:19 AM 07/19/2019 08:44 AM
Bridge 2077.5 Scuppers - Plan notes indicate that Replacing Scuppers Will Be Paid Under Item 615075-... 164 07/10/2019 09:20 AM 07/19/2019 08:44 AM
Railroad Crossing - Item 900020-001 for Temporary Railroad Crossing is provided as a special provisi... 165 07/10/2019 09:21 AM 07/19/2019 08:45 AM
Bridge 2077.5 Splash Blocks - Plan notes indicate Splash Blocks Will Be Incidental to Item 615075-00... 166 07/10/2019 09:22 AM 07/19/2019 08:52 AM
Roadway Limits - Sheets 18/19 provide the station limits for the crossovers and shoulder replacement... 167 07/10/2019 09:22 AM 07/19/2019 08:52 AM
Temporary Bridge - Is the temporary bridge added on an Amendment No. 1 drawing a part of the contrac... 168 07/10/2019 10:42 AM 07/15/2019 07:25 AM
Agg for Maintaining Traffic - The quantity tables provide for 48 TN of Agg for Maint Traffic, Cl 2 a... 169 07/10/2019 10:44 AM 07/15/2019 07:24 AM
Bridge 2070 - Ramp K - The table of jacking loads on sheet L48 of L81 lists dead loads for jacking. ... 170 07/10/2019 01:49 PM 07/15/2019 07:24 AM
Bridge 2070 - Ramp K - The table of jacking loads on sheet L48 of L81 lists dead loads for jacking. ... 171 07/10/2019 01:50 PM 07/15/2019 07:23 AM
Bridge 2070-1.2 Westbound - The Special Provisions and TTCP plans require closure of the 2070-6.1 Ra... 172 07/10/2019 01:51 PM 07/15/2019 07:23 AM
Maintenance - Does the contractor have any requirement to carry the cost to maintain the existing ro... 173 07/10/2019 01:52 PM 07/22/2019 07:54 AM
Proposal line numbers - Proposal line numbers 1935 and 2040: Both items are concrete protective coa... 174 07/10/2019 01:52 PM 07/15/2019 07:22 AM
Hazardous Waste Generator - Please confirm the DOH will be considered the generator of all contamina... 175 07/10/2019 03:31 PM 07/22/2019 07:53 AM
BEL-70 Bridge - Downspouting - There are conflicting notes on the Belmont Bridge regarding payment f... 176 07/11/2019 09:49 AM 07/19/2019 08:53 AM
ELM GROVE I/C - Class B Concrete quantity is considerably less than plan quantity. Please check pl... 177 07/11/2019 09:57 AM 07/19/2019 08:53 AM
Greenwood Cemetary Bridge - Are there existing plans for Greenwood Cemetary Bridge that show the par... 178 07/11/2019 09:58 AM 07/19/2019 08:55 AM
Questions 163, 164, and 166 - The questions submitted incorrectly referenced Bridge No. 2077.5. The... 179 07/11/2019 10:10 AM 07/19/2019 08:56 AM
Clean and Paint - Top Flange Only - Clean and Paint - Top Flange Only bid items were added to six st... 180 07/11/2019 12:56 PM 07/15/2019 07:22 AM
Fulton Bridge Structural Steel - Plan pages M84-M87 show structural steel painting limits of 15 feet... 181 07/11/2019 02:09 PM 07/15/2019 07:21 AM
Median Ty X - The temporary traffic control plans show existing median barrier removed for the WB I-... 182 07/11/2019 02:27 PM 07/19/2019 08:56 AM
Median Ty X - The existing median barrier from Sta 324+00 to 331+00 and Sta 354+05 to 356+85 include... 183 07/11/2019 02:29 PM 07/19/2019 08:56 AM
Elm Grove Bridges - Primary Reinforcement - In the tabulations for this bridge Sheet R5, the quantit... 184 07/11/2019 05:44 PM 07/19/2019 09:03 AM
Ft. Henry - Repair S16 The repair details on C112 call out 2L6x4x3/8 to be installed. Where are both... 185 07/12/2019 08:59 AM 07/19/2019 09:04 AM
Ft. Henry Bridge - Repair S16: How is the new 1/2" plate at FB8 North Side shown on C114 to be attac... 186 07/12/2019 09:04 AM 07/19/2019 09:04 AM
Ft. Henry Bridge - Repair S16: The new FB3 stiffener shown on C118 is called out to be welded to the... 187 07/12/2019 09:05 AM 07/19/2019 09:04 AM
Ft. Henry Bridge - Repair S16: The repair on C118 has the stringer bearing hashed like it is to be r... 188 07/12/2019 09:07 AM 07/19/2019 09:05 AM
Ft. Henry Bridge - Repair S18: The bid item quantity, the quantities called out on the repair locati... 189 07/12/2019 09:08 AM 07/19/2019 09:06 AM
Ft. Henry Bridge - Repair P2: The repair location plan, framing plan., and C122 all call out 11ea P2... 190 07/12/2019 09:08 AM 07/19/2019 09:06 AM
Ft. Henry Bridge - Repair S19: The number of S19 repair locations shown on the repair location and f... 191 07/12/2019 09:09 AM 07/19/2019 09:07 AM
Ft. Henry Bridge - Repair S22: The number of S12 repair locations shown on the repair location and f... 192 07/12/2019 09:09 AM 07/19/2019 09:07 AM
Elm Grove Bridge - EB3 Concrete Pedestals - Does a concrete pedestal modification plan exist for Ben... 193 07/12/2019 12:15 PM 07/19/2019 09:07 AM
Elm Grove Bridge - C7 Repairs - Several pages of Bent Repair plans list a C7 Repair - Substructure M... 194 07/12/2019 12:21 PM 07/19/2019 09:10 AM
Milestone Dates and Addendum #3 requirements - Addendum #3 added a number of requirements that will ... 195 07/14/2019 06:52 PM 07/19/2019 09:13 AM
Fulton Bridge - Vibration Monitoring - Page M7 (Sheet 1736) of the General Notes requires that the G... 196 07/15/2019 09:19 AM 07/19/2019 09:10 AM
Fulton Bridge - Removal of Piles - Page M28 (Sheet 1757)-Abutment 2 EB and M43(Sheet 1772)- Abutment... 197 07/15/2019 09:20 AM 07/19/2019 09:10 AM
Structures - Please provide structural plans on how to saw cut the parapets and TTCP details on how ... 198 07/15/2019 11:18 AM 07/19/2019 09:13 AM
Environmental - Has the DOH completed mussel surveys under Back Channel and Fulton Bridges and were ... 199 07/15/2019 11:19 AM 07/19/2019 09:16 AM
Bid Date - Any possibility the bid could move two days to August 1, 2019? This would greatly help wi... 200 07/15/2019 03:06 PM 07/19/2019 09:14 AM
Class H Deck Concrete - The quantity notes at all of the bridges include the note "Quantity of Class... 201 07/16/2019 01:43 PM 07/19/2019 09:14 AM
Patching - Special Provision 601.10.5.1 Rapid Set Cementitious Patching Acceptance Criteria states "... 202 07/16/2019 01:44 PM 07/22/2019 07:41 AM
Patching - How is the replacement of deteriorated reinforcing steel encountered in the various patch... 203 07/16/2019 01:45 PM 07/19/2019 09:15 AM
Patching - Will epoxy bonding compound by required for shotcrete repairs? (Spec 601.10 G) 204 07/16/2019 01:56 PM 07/19/2019 09:15 AM
Painting - The response to question 88 stated that there would be more clarification on the containm... 205 07/16/2019 01:56 PM 07/19/2019 09:15 AM
Patching - Special provision 601.2 materials, lists an epoxy bonding compound conforming to ASTM C88... 206 07/16/2019 01:57 PM 07/19/2019 09:16 AM
Micropile Load Tests - Section 616.6-Pile Load Tests states "These pile load tests shall be performe... 207 07/17/2019 08:49 AM 07/22/2019 07:42 AM
Micropile Pipe/Casing - Section 616.2.6-Pipe/Casing states "Pipe/Casing shall be “Prime” steel". Pr... 208 07/17/2019 08:51 AM 07/22/2019 07:54 AM
Ramp E - Bearings - There is a discrepancy with overall quantity for Guided and Non-Guided bearings ... 209 07/17/2019 01:32 PM 07/22/2019 07:43 AM
Elm Grove Bridge #2077.5 - Please verify your class K concrete quantity. Our Take off is significan... 210 07/17/2019 03:21 PM 07/22/2019 07:44 AM
Elm Grove Bridge #2077.5 - No detail is given for the new down spouting, is it the departments inten... 211 07/17/2019 03:22 PM 07/22/2019 07:45 AM
Elm Grove Bridge #2077.5 - Repair C8 Concrete Slope Protection the plan set shows no detail on appro... 212 07/17/2019 03:22 PM 07/22/2019 07:45 AM
General - Bridge - Is jacking required at the B4 repairs? 213 07/17/2019 03:23 PM 07/22/2019 07:46 AM
Back Channel Bridge #2034.2 - Repair S16 consists of bottom and top lateral bracing connection plate... 214 07/17/2019 03:25 PM 07/22/2019 07:46 AM
Question 172 Follow-up - The response to Question 172 stated that at least one lane of the Westbound... 215 07/17/2019 08:37 PM 07/22/2019 07:49 AM
letting date - if anyway possible could the letting date be moved to august 1 with another addendum ... 216 07/18/2019 12:07 PM 07/22/2019 07:46 AM
BEL-70 Bridge - Median Barrier - Under which bid items are the concrete and rebar to be included for... 217 07/18/2019 01:09 PM 07/22/2019 07:45 AM
Class K Concrete - On sheet 2576, the Class K Concrete (Approach Slab Barrier) along with reinforcin... 218 07/18/2019 02:10 PM 07/22/2019 07:48 AM
Bridge 2074.3 - Mt Dechantal - The table of jacking loads on sheet P66 of P106 lists dead loads for ... 219 07/19/2019 11:18 AM 07/22/2019 07:49 AM
Bridge 2034.2 Repair S5 - Will the weight for the 41 Each S5 Repairs be provided in Amendment No. 4? 220 07/19/2019 01:46 PM 07/23/2019 04:29 PM
Section #627: Strip Seal Expansion Joint Assembly - Sheet #194 of Proposal book under Special Provis... 221 07/19/2019 02:36 PM 07/23/2019 04:29 PM
Bridge 2078.5 Fabricated Structural Steel Post Addendum 3 - Addendum 3 removed the diaphragm replace... 222 07/20/2019 01:56 PM 07/23/2019 04:30 PM
Bridge #2034.2 & #1830.3 Modular Expansion Joints - What is the governing factor for sizing the Modu... 223 07/22/2019 09:18 AM 07/23/2019 04:31 PM
Bridge 1830.3 Expansion Joints - For the sidewalk joints at Span 5 and Piers 8 & 9, will an open joi... 224 07/22/2019 09:46 AM 07/24/2019 09:27 AM
Section 627: Modular Expansion Joint System – Upturn Requirement - Section 627: Modular Expansion Jo... 225 07/22/2019 03:13 PM 07/23/2019 04:31 PM
Eradication of Pavement Marking - Item 636007-001 Eradication of Pavement Marking is listed in propo... 226 07/22/2019 09:05 PM 07/23/2019 04:27 PM
Fulton Bridge Drainage - The Structural Steel tabs on Sheet M11 do not appear to include the drainag... 227 07/22/2019 09:26 PM 07/23/2019 04:32 PM
Temporary Marking Tape, Type VIII C - Proposal has temporary marking tape, Type VIIIC 6" and 8" list... 228 07/22/2019 09:56 PM 07/24/2019 09:27 AM
Sign Supports for Temporary Signs - Plan Sheet 242F lists the following qty for sign supports for te... 229 07/22/2019 10:28 PM 07/23/2019 04:26 PM
TTCP General Notes - TCCP General notes, page 88, number 45. states that oversize signs shall be bid... 230 07/23/2019 09:10 AM 07/23/2019 04:28 PM
404 Permit - A date for the contractor to be allowed in stream needs to be established by the owner ... 231 07/23/2019 01:39 PM 07/24/2019 03:01 PM
B&O Tax - Confirm that B&O tax will be applied to the overall project. This cost compounds with all ... 232 07/23/2019 03:44 PM 07/24/2019 04:00 PM
Primary Reinforcement Quantity - Please verify primary reinforcement quantity for Middle Creek Bridg... 233 07/24/2019 09:06 AM 07/24/2019 06:01 PM
Pre Bid Question 82 Follow Up - Answer to PBQ 82 indicated that the note requiring the contractor to... 234 07/24/2019 10:02 AM 07/24/2019 06:00 PM
Fort Henry Bridge Aluminum Pedestrian Railing - There are existing brackets that need removed undern... 235 07/24/2019 01:08 PM 07/24/2019 06:00 PM
Elm Grove I/C - Is the Modified Concrete Class K on the Elm Grove I/C bridge Lightweight? Plan gene... 236 07/24/2019 03:14 PM 07/24/2019 06:01 PM
Eradication of Pavement Markings - Plan Sheet 342 has Eradication of Pavement Markings listed in the... 237 07/24/2019 05:58 PM 07/25/2019 09:03 AM
Bridge 2034.2 - Piers 7&10 Retrofits - Drawing B95 indicates 5 1/2" column retrofits while other pla... 238 07/25/2019 08:36 AM 07/25/2019 02:27 PM
Eradication of Pavement Markings - So since Amendment 5 and Amendment 6 did not update the quantity ... 239 07/25/2019 10:13 AM 07/25/2019 02:20 PM
Back Channel Bridge, Class H - Please revisit question 138. Unit 4 Deck Quantity was going to be ad... 240 07/25/2019 01:32 PM 07/26/2019 08:25 AM
1ST BRIDGE - It appears the plan quantity for Class K concrete does not include the approach slab ba... 241 07/25/2019 01:33 PM 07/25/2019 05:12 PM